Manual for submarine miningUnited States. War Department
History
Manual for submarine mining
United States. War Department
Submarine mines -- Handbooks, manuals, etc.
The lips of the fuse can and connecting collar are covered with a
thin covering of rubber cement. A piece of rubber tape is cut about
18 inches long and laid around this opening without stretching. A
piece of protective tape is cut about 18 inches long and laid over the
rubber tape with considerable stress. This forces the soft tape over
the lips on the connecting collar and the fuse can and makes a tight
but flexible joint. The stuffing box in the plug proper is prepared as
under (_a_).
Great care must be taken not to injure the insulation of the loading
wire in tightening up the follower in the stuffing box of the fuse can
or of the plug proper.
(_c_) =Trotol fuse can.=—Starting with the compound plug dismantled.
Two mine service fuses, which have been tested for continuity of
circuit, are cut with 12-inch leads, the wires bared for 1 inch and
connected in multiple. A piece of loading wire is cut about 3 feet long
and the ends bared for telegraph joints. The loading wire is threaded
through the fuse can and cap. The threads of the fuse can are covered
with ruberine. The can is screwed into the cap. The threads of the
connecting collar are coated with ruberine and the collar is screwed
down entirely. The loading wire should project about 4 inches above the
connecting collar. The stuffing box of the cap is prepared. The plug
proper is held upright in a vise. The fuse can cap, its threads having
been coated with ruberine, is screwed firmly into the plug proper by
means of a spanner wrench. The loading wire must be pulled through the
opening in the plug proper with extreme care. It must not be injured in
placing the fuse can in position and screwing it home.
The fuses are inserted in the fuse can, which is filled with trotol
to the top of the connecting collar. The transformer leads are cut 4
inches long and the ends bared for 1 inch. The threads of the brass
collar are covered with ruberine. It is screwed on the transformer.
The latter is raised vertically above the fuse can and lowered on the
connecting bolts.
Telegraph joints are made between the secondary leads and the fuses
and the primary lead and the loading wire. The joints are wound with
rubber tape, care being taken that no sharp ends cut through the tape.
The leads and joints are coiled in the base of the transformer. The
connecting collar, its threads having been covered with ruberine,
is screwed upon the transformer against the brass collar. The
bolt-securing nuts and cotter pins are placed in position. The stuffing
box in the plug proper is assembled as under (_a_).
The actual resistance of the assembled plug in the vertical and the
horizontal positions is determined by testing with a voltmeter.
In service, after the loaded plug tests out satisfactorily, all set
screws are set up.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account