Manual of Ship Subsidies: An Historical Summary of the Systems of All NationsBacon, Edwin M. (Edwin Monroe)
History
Manual of Ship Subsidies: An Historical Summary of the Systems of All Nations
Bacon, Edwin M. (Edwin Monroe)
Shipping bounties and subsidies
In 1871-72, when a renewed effort was made to establish an American
line of American-built ships,[AU] the British subsidies were again
increased. Then, also, was instituted by the Admiralty the naval
subvention system--the payment of annual retainers to certain classes of
merchant steamers, the largest and swiftest, in readiness for quick
conversion into auxiliary naval ships in case of war, and to preclude
their becoming available for the service of any power inimical to
British interests.
At the expiration of the Cunard and Inman seven years' contracts the
postmaster-general applied the principle of payment according to weight
throughout for the carriage of the North American mails. But preference
was given to British ships, these receiving higher rates per pound than
the foreign. In 1887 an arrangement was entered into by which the Cunard
and Oceanic lines were to carry all mails except specially directed
letters, and the pay was reduced.[AV] This method of payment continued
till 1903.
Then another sharp change was made in the subsidy system to meet
another, and most threatening American move. In 1902 was formed by
certain American steamship men, through the assistance of J. Pierpont
Morgan, the "International Mercantile Marine Company," in popular
parlance, the "Morgan Steamship Merger," a "combine" of a large
proportion of the transatlantic steam lines.[AW] Upon this, in response
to a popular clamor, subsidy, and in a large dose, was openly granted to
sustain British supremacy in overseas steam-shipping. To keep the Cunard
Line out of the American merger, and hold it absolutely under British
control and British capitalization, and, furthermore, to aid the company
immediately to build ships capable of equalling if not surpassing the
highest type of ocean liners that had to that time been produced (the
highest type then being German-built steamers operating under the German
flag), the Cunard Company were resubsidized with a special fixed subsidy
of three-quarters of a million dollars a year, instead of the Admiralty
subvention of about seventy-five thousand dollars, and in addition to
their regular mail pay, the subsidy to run for a period of twenty years
after the completion of the second of two high-grade, high-speed ocean
"greyhounds" called for for the Atlantic trade. The Government were to
lend the money for the construction of the two new ships at the rate of
2-3/4 per cent per annum, the company to repay the loan by annual
payments extending over twenty years. The company on their part pledged
themselves, until the expiry of the agreement, to remain a purely
British undertaking, the management, the stock of the corporation, and
their ships, to be in the hands of or held by British subjects only.
They were to hold the whole of their fleet, including the two new
vessels, and all others to be built, at the disposal of the Government,
the latter being at liberty to charter or purchase any or all at agreed
rates.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account