Metropolitan Subway and Elevated Systems: Bulletin 49General Electric Company
History
Metropolitan Subway and Elevated Systems: Bulletin 49
General Electric Company
Railroads, Elevated -- United States; Subways -- United States
Transcriber Notes
● Obvious typos and punctuation errors fixed.
● Inconsistencies in hyphenation kept as in the original.
● Italics are represented by underscores surrounding the _italic text_.
● Small capitals have been converted to ALL CAPS.
● Superscripts are noted by a caret and curly brackets, e.g. 59^{TH}.
● A decorative GE logo is represented by [GE logo]
------------------------------------------------------------------------
[Illustration:
METROPOLITAN SUBWAY
and ELEVATED SYSTEMS
GE
Presented As Bulletin Number 49 By The
ELECTRIC RAILWAY HISTORICAL SOCIETY
Price $1.50
]
------------------------------------------------------------------------
BOSTON ELEVATED RAILWAY RAPID TRANSIT SYSTEM
The transportation system of the city of Boston comprises a combination
of both rapid transit and surface lines operated under a single fare
arrangement with transfer privileges permitting a continuous ride in one
general direction from one end to the other of the system. The elevated
lines and the Tremont St. Subway were originally built by the railway
company in 1901. Today the total transportation system includes more
than 500 miles of line of which 37 miles are subway and elevated tracks.
The population served in the district of more than 92 square miles is
considerably over a million people and the number of revenue passengers
carried, approximates 350,000,000 per year. Statistics are not available
as to the passengers carried on the Rapid Transit lines.
[Illustration: EXTERIOR OF MAIN POWER STATION AT SOUTH BOSTON]
The original elevated structure operated between Sullivan Sq.,
Charlestown, and Dudley Street, with two branches through the city, one
by subway under Tremont St. and the other by the way of Atlantic Ave.
and South Station. In 1908-9 the elevated structure was extended to the
present terminal at Forest Hills and the Washington St. Subway was
completed through the business part of the city. The Cambridge Subway
was placed in operation in 1912. Recent extensions include an elevated
line from Sullivan Square to Everett and reconstruction of the tunnel to
East Boston.
Since July 1, 1919, the system has been operated by the Board of
Trustees of the Commonwealth. Under the direction of this board are
included not only the details of operation and management, but also the
decisions as to fares to be charged independent of the State Department
of Public Utilities.
Under the direction of the present management a continuous program of
improvements has been inaugurated which has necessitated the re-routing
of trains to handle the traffic to the best advantage.
Briefly there are four main routes as follows:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account