Metropolitan Subway and Elevated Systems: Bulletin 49General Electric Company
History
Metropolitan Subway and Elevated Systems: Bulletin 49
General Electric Company
Railroads, Elevated -- United States; Subways -- United States
Forest Hills-Everett (via tunnel) 8.59 miles
Forest Hills-Everett (via elev.) 9.35 miles
Harvard-Andrew 5.56 miles
No. Station West-Kenmore 2.87 miles
Bowdoin-Maverick Sq. 1.67 miles
The Forest Hills-Everett route is called the main line, and the
Harvard-Andrew route the Cambridge Subway. The Bowdoin-Maverick Square
line up to the present has been operating three-car trains with overhead
trolley, but new equipment consisting of steel cars is now on order and
the third rail is now being installed in the tunnel. The Lechmere
Sq.-Broadway line over East Cambridge Viaduct and Tremont St. Subway is
also considered a rapid transit route, although surface type cars are
used with overhead trolley. These cars are equipped for multiple unit
control and are operated in three-car trains.
[Illustration: 35,000-KW. TURBO-GENERATOR IN SOUTH BOSTON POWER STATION]
The rush hour trains on the main line include as high as eight cars,
which is the limit set by the length of the station platforms. The
signal system is entirely automatic and during rush hours the headway
varies from 2 to 3½ minutes on the main line. The maximum grades
encountered are 2 to 3 percent with a high percentage of heavy
curvature. By taking advantage of the transfer arrangements at
terminals, rides of 14 miles can be obtained for a single fare.
_Power Station Equipment_
The power system as originally installed included several engine-driven
direct-current plants suitably located for distributing 600 volts direct
to the trolley. With the extension of the system, however, an
alternating-current station was installed at South Boston, generating
25-cycle three-phase current for distribution at 13,200 volts to
synchronous converter substations. Alternating-current generating
equipment has also been installed at the Lincoln Station. The total
installed capacity of turbine stations is now 115,000 kw. while the
direct-current generating stations have practically all been
discontinued.
[Illustration: RAPID TRANSIT LINES—BOSTON ELEVATED RAILWAY]
[Illustration: EXTERIOR OF EGLESTON SQUARE SUBSTATION]
_Substations_
There are in operation for supplying power to both elevated and surface
lines a total of 12 synchronous converter substations having a total
rated capacity of 58,000 kw. The power consumption of the Rapid Transit
lines is somewhat less than half the total energy used.
_Distribution_
Direct current is distributed from the several substations at 600 volts
and is collected on the rapid transit systems from an 85-lb.
over-running third rail.
_Rolling Stock_
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account