Modern Copper Smelting: being lectures delivered at Birmingham University, greatly extended and adapted and with and introduction on the history, uses and properties of copper.Levy, Donald M.
Science
Modern Copper Smelting: being lectures delivered at Birmingham University, greatly extended and adapted and with and introduction on the history, uses and properties of copper.
Levy, Donald M.
Copper -- Metallurgy
The operation of lining is conducted with much care; the old lining
is knocked away where necessary, rods are placed through the tuyere
holes, and lining mixture is dumped in; 6-inch layers of material at a
time being stamped down hard by means of an Ingersoll-Sargent tamping
machine, until the lining reaches within 6 inches of the tuyeres. The
wooden mould for the cavity, made up of a number of jointed pieces, is
then placed in position, and the ramming of layer after layer round
the sides is continued as before. The hood, inverted, is lined in a
similar manner, it is then placed in position on the converter body
and bolted down, a joint being made of moistened lining material. The
whole operation takes about 1½ hours. The converter is then slowly
dried by a wood fire, coal being subsequently added and kept burning
under the action of a low blast for five or six hours; it is conveyed
to the stand when required, dropped into position on the trunnion
bearings, and the connections and adjustments very readily made.
The manipulation of relining at the Tennessee smelter is conducted in a
very similar manner.
_Basic Linings._—The all-important feature of the basic lining is its
permanence, which, rendering the frequent relining of the converter
unnecessary, allows of many economies in connection with capital
outlay on plant and in operating costs. Further, owing to the lessened
need for lining repairs, the frequent hauling of converters to the
repair-shops situated at the further end of the buildings is avoided.
This allows the employment of much larger converter units, with obvious
attendant advantages, whilst it increases the ultimate possibility of
continuous operation. Thus, the size at present employed, though the
process has been in operation but a short time, is 26 feet by 12 feet,
with a capacity of 35 to 45 tons of matte, and a daily output of 33
tons of copper from 40 per cent. matte. Such a converter, lined with
9 inches of basic material, will operate for 2,000 to 3,000 tons of
copper before requiring repairs.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account