One of the most remarkable features of the gallery was the method
devised to supply the diggers at the end with fresh air. The longer the
tunnel grew, the more serious became the problem of ventilation. It had
been considered impossible to dig a tunnel for any considerable distance
without spacing shafts at regular intervals in order to replace the
polluted air with a fresh supply. This problem had been solved by the
application of the simple physical principle that warm air tends to
rise. Behind the Union picket line and to the right of the mine gallery,
although connected with it, the miners dug a ventilating chimney.
Between the chimney and the mine entrance they erected an airtight
canvas door. Through that door and along the floor of the gallery there
was laid a square wooden pipe. A fire was then built at the bottom of
the ventilating shaft. As the fire warmed the air it went up the
chimney. The draft thus created drew the bad air from the end of the
tunnel where the men were digging. As this went out, fresh air was drawn
in through the wooden pipe to replace it.
Work on the tunnel had been continuously pushed from the start on June
25. By July 17 the diggers were nearly 511 feet from the entrance and
directly beneath the battery in Elliott’s Salient. The Confederates had
become suspicious by this time, for the faint sounds of digging could be
heard issuing from the earth. Their apprehension took the form of
countermines behind their own lines. Several of these were dug in an
effort to locate the Union gallery. Two were very close, being sunk on
either side of where the Pennsylvanians were at work. Although digging
in the countermines continued throughout the month of July, Confederate
fears seemed to quiet down during the same period. There were many
reasons for this. One was the failure of their tunnels to strike any
Union construction. Another major reason, undoubtedly, was a belief held
by many that it was impossible to ventilate a shaft of any length over
400 feet without constructing air shafts along it.
The next step in the Union plan was to burrow out into lateral galleries
at the end of the long shaft. Accordingly, on July 18 work was begun on
these branches which extended to the right and left, paralleling the
Confederate fortifications above. When completed, these added another 75
feet to the total length of the tunnel which now reached 586 feet into
the earth. It was about 20 feet from the floor of the tunnel to the
enemy works above. The average internal dimensions of the shaft were 5
feet high, with a base 4½ feet in width tapering to 2 feet at the top.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account