Practical Methods of Sewage Disposal for Residences, Hotels and InstitutionsOgden, Henry N. (Henry Neely)
Science
Practical Methods of Sewage Disposal for Residences, Hotels and Institutions
Ogden, Henry N. (Henry Neely)
Sewage disposal
The tank should generally be placed with its top at the level of the
ground surface, and the sewer from the house should enter the end of the
tank with its flow line or invert 12 inches below the top of the walls.
The house sewer or drain should have a grade or fall of not less than 9
inches in 100 feet. Preferably, the sewer should be laid at the above
minimum grade for at least 50 feet or so before it enters the tank in
order to prevent excessive velocity in the sewage flow at this point. At
the entrance to the tank the sewer should be provided with an elbow so
that the sewage will be discharged downward below the surface.
Similarly, if an outlet pipe from the tank is used, as shown in Fig. 5,
this pipe should pass through the wall at the outlet end of the tank,
one foot below the top of the tank, and should also be provided with an
elbow which will start from below the surface.
Where a siphon is to be used to discharge the effluent from the tank
onto a filter or into a system of sub-surface tiling, the separate
chamber in which the siphon must be placed may be built as an extension
of the settling tank so that the end wall of the settling tank will
serve as one of the walls of the siphon chamber.
The siphon chamber floor may be placed considerably above the level of
the floor of the tank as shown in Figs. 2 and 3, since a sufficiently
large quantity of effluent for dosing a filter or a sub-surface
irrigation system may be collected in the chamber of reduced depth thus
provided. This shallower construction saves excavation and also reduces
the operating head or fall, which latter is sometimes hardly equal to
the demands of the subsequent treatment. The capacity needed in this
chamber for different installations will be given later in the
discussion of sewage filters and sub-surface irrigation systems.
Having determined upon the dimensions of the tank and selected the site,
the construction is commenced by making the excavation about four feet
wider and longer than the outside dimensions of the tank and siphon
chamber combined, in order to provide room for setting the forms for
placing the concrete, provided concrete is to be used in its
construction. With brick walls an additional width and length of two
feet is needed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account