Fig. 4 gives an illustration of the forms to be used in constructing the
walls for concrete tanks, the cut at the left showing a view of the form
to be used when the tank is constructed either partly or wholly above
the natural ground surface, or below the surface in loose soils, and the
cut at the right showing a view of the form to be used when excavation
for the tank is made in rock, hardpan, or clay. The top width of the
walls should be 8 inches, and the bottom width should be 8 inches plus
1½ inches for each foot of height. Thus, for a wall 6 feet high the
bottom width should be 17 inches,—the inside face of the wall having a
batter of 1½ inches per foot of height. This batter is necessary, when
the tank is constructed below the ground surface, to withstand the
lateral earth pressure when the tank is empty. If the tank is to be
constructed above the ground surface, the outside wall should be
battered and the inside wall made vertical, since the pressure which the
wall must withstand is then only from the liquid within the tank. The
partition wall between the settling tank and siphon chamber should be 10
or 12 inches thick at the top, depending on its height, and should have
a batter on both sides.
[Illustration: FIG. 4.—Forms Used for Building Side Walls for Concrete
Tank.]
To set up the forms for the concrete walls, stakes 2 inches by 4 inches
and about 2½ feet long are first driven on each side of the bottom of
the wall, and 6 inches away from the wall as laid out, at intervals of 2
feet. Pieces of scantling, 2 inches by 4 inches and with a length equal
to the height of the wall, are then placed in upright position and
securely nailed to these stakes. The inner scantling are then inclined
and temporarily fastened at the top by a short nailing piece to the
outer row so as to leave an opening of 10 inches between each pair of
scantling. Additional stakes are then driven from 2 to 4 feet from the
wall on each side, as shown in the illustration, and braces 2 inches
thick and 3 inches or 4 inches wide are nailed to these stakes and to
the upright and inclined scantling. One-inch boards are then lightly
nailed to the scantling, as shown, the boards making up the inside face
of the form being placed in sections of two feet in order to afford
opportunity for thorough tamping of the concrete as the form is being
filled. The concrete is then placed between the boarded sides of the
form in 6–inch layers and well rammed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account