The concrete should be composed of one part by measure of Portland
cement to two and a half parts of clean, sharp building sand and five
parts of broken stone or clean gravel. The cement and sand should first
be thoroughly mixed, while dry, to an even color and then wet and
tempered to a soft mortar. The broken stone or gravel, after having
first been thoroughly wet, should be spread evenly over the batch of
mortar and the mass shoveled over at least three times to insure a
thorough coating of the stones with mortar. The concrete thus made may
then be placed in the forms in six-inch depths and thoroughly rammed
until water covers the surface.
When it is essential that the tank be water-tight, and, in fact, in
constructing all tanks, each layer of concrete should be placed between
the forms, when possible, before the concrete in the layer previously
placed has set. If the work of placing the concrete is of necessity
interrupted, before placing another layer the surface of the older
concrete should first be sprinkled and swept with a stiff broom and a
thin coating of neat cement mortar (containing no sand) should then be
washed over the surface of the concrete.
It may be noted that a barrel of Portland cement (equal to four bags)
contains 3.8 cubic feet, so for concrete with the proportions of cement,
sand, and stone as specified above, for each barrel of cement used there
should be used 9.5 cubic feet of loose sand and 19 cubic feet of loose
stone; and for each cubic yard of concrete required there will be needed
1.30 barrels (or 5.2 bags) of cement, 0.46 cubic yards of sand, and 0.92
cubic yards of stone if the stone is fairly uniform in size and contains
forty-five per cent. of voids. With stone or gravel less uniform in
size, less cement and sand is required. The cement and sand, made into
mortar, will fill the voids or open spaces in the mass of broken stone.
(For further details see Chapter VII.)
As shown in the illustration (Fig. 4), the foot of each upright and
inclined scantling should be placed at the proposed elevation of the
floor of the tank, and the boarding should not be carried below this
level. Then, if the excavation for the wall has been carried to a level
6 or 8 inches lower than the floor of the tank, the concrete when being
placed between the forms will spread under the bottom of the forms,
making a footing for the wall on the outside and better insuring a
water-tight joint when the floor is laid against the inside foot of the
walls.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account