It now only remained, to complete the dam, to close the openings. This
was done in a manner that can be readily understood by reference to
the cuts. Gates had been constructed with timber 10 in. thick, bolted
together. They were hung on strong wooden hinges and, before being
closed, laid back on the face of dam as shown at B, Figs. 1, 2, and 3.
They were all closed in a short time on the afternoon of 9th November,
1881. To do this it was simply necessary to turn them over, when the
strong current through the sluices carried them into their places, as
shown at A, Figs. 2 and 3 and by the dotted lines on Fig. 1. The closing
was a delicate as well as dangerous operation, but was as successfully
done as could be expected. No accident happened further than the
displacement of two or three of the gates. The openings thus left
were afterward filled up with timber and brushwood. The large opening
alongside of the slide was filled up by a crib built above and floated
into place.
The design contemplates the filling up with stone and gravel on
up-stream side of dam about the triangular space that would be formed by
the production of the line of face of flat dam till it struck the rock.
Part of that was done from the ice last winter; the balance is being put
in this winter.
Observations last summer showed that the calculations as to the raising
of the surface of the river were correct. When the depth on the crest
was 2.50 feet, the water at the foot of the Longue Sault was found to be
25 in. higher than if no dam existed. The intention was to raise it 24
in.
The timber slide was formed by binding parallel piers about 600 feet
long up and down stream, as shown on the map, and 28 ft. apart, with a
timber bottom, the top of which at upper end is 3 ft. below the crest
of dam. It has the necessary stop logs, with machinery to move them, to
control the water. The approach is formed by detached piers, connected
by guide booms, extending about half a mile up stream. See map.
Alongside of the south side of the slide a large bulkhead was built, 69
ft. wide, with a clear waterway of 60 ft. It was furnished with stop
logs and machinery to handle them. When not further required, it was
filled up by a crib as before mentioned.
The following table shows the materials used in the dam and slide, and
the cost:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account