=164. Shafts.=—In sinking a shaft in soft material, the excavation is
usually done by hand, the material being thrown into a bucket which is
hoisted to the surface and dumped. The size of the shaft is independent
of the size of the sewer and depends principally on the machinery which
it is necessary to lower into the tunnel. Ordinarily a shaft 6 feet in
the clear is satisfactory. A method of timbering a shaft is shown in
Fig. 115. Because of the timbering the shaft must be started
sufficiently large at the top to finish with the desired dimensions at
the bottom. This excess size is sometimes obviated by driving the
sheeting at an angle to maintain the same size of shaft from top to
bottom.
In timbering a shaft as shown in Fig. 115 the upper frame is staked
securely in position at the surface of the ground. This frame is
composed of timbers fastened together in the form of a square with the
ends of the timbers extending about 12 inches on all sides. The
protruding ends are used to hold the frame in position. Excavation is
begun inside the frame, and sheeting is driven around the outside of it
as excavation progresses. Only two or three men can work advantageously
at one time in these small shafts. The second frame is made up of the
same size timbers, but all are cut off flush with the outside of the
square. The outside dimensions of this frame are such as to allow
sheeting to be slipped in between it and the sheeting already driven.
The frame is lowered into position and supported from the upper frame by
vertical struts nailed to it. The lower end of the sheeting already
driven is held out from the lower frame by blocks of the thickness of
the next length of sheeting. These blocks are removed as the next length
of sheeting is placed and driven. The driving of the sheeting is
facilitated by excavating beneath it as it descends.
[Illustration:
FIG. 115.—Section of Shaft Timbering.
Abbot, Journal Western Society of Engineers, Vol. 22.
]
The sizes of sheeting and timbering should be computed on the same basis
as that for trench sheeting except that for depths greater than 30 to 35
feet Rankine’s Theory is not applicable and judgment must be relied on
for computing the sizes for deep shafts. In stiff dry material the
pressures will change very little as the depth increases. Sheeting is
needed in shaft excavation in rock only to protect the workmen from
falling fragments, but in sand, particularly in quicksand and in wet
ground, the pressures increase directly with the depth and the sheeting
should be computed accordingly. Care must be taken to prevent the
formation of cavities behind the sheeting, to fill them if formed, and
to see that all pieces of the sheeting and bracing have a firm bearing.
It is difficult to prevent the collapse of the shaft once the movement
of earth against the sheeting has commenced.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account