The distance between frames is dependent on the size of the tunnel and
the character of the material. It is seldom greater than 6 feet and the
frames are sometimes placed touching each other. The size of the
timbering is a matter of experience and is generally determined by the
judgment of the responsible person in charge of the construction as the
result of observation during the progress of the work.
The sheeting between frames is called poling boards, or spiling or
lagging according as it is sharpened and driven ahead of the excavation
or placed after the excavation has progressed. The horizontal strips
placed between the frames to keep them apart are called wales.
[Illustration:
FIG. 116.—Types of Frames and Timbering for Tunnels.
]
In cutting out from the shaft in soft materials requiring support, where
the width of the tunnel is the same or smaller than that of the shaft, a
frame with a maximum width four thicknesses of sheeting less than the
width of the tunnel is set up against the lining of the shaft. The
vertical side pieces of the tunnel frame rest on the bottom frame of the
shaft as a sill and are securely wedged into position. As the lining of
the shaft at the top is cut away the top poling boards of the tunnel are
slipped in between the cap of the first tunnel frame and the shaft frame
immediately above it. The poling boards are driven with an upward pitch
so that there may be room to slip the second length of boards between
the next tunnel frame and the first length of boards. The placing of the
side sheeting follows in a similar manner. Excavation is then started
and the poling boards driven to keep pace with it. The next frame is
placed in position and the previous sheeting or boards wedged out a
sufficient distance to allow the advance lining to be slipped in when
the wedges are removed. Waling pieces are nailed firmly between the
frames to hold them in position. The various phases in the driving of a
12–foot sewer tunnel in Seattle are shown in Fig. 117.
[Illustration:
FIG. 117.—Stages of Sewer Tunneling.
Eng. Record, Vol. 69, 1914, p. 195.
]
In soft or running material it may be necessary to protect the face of
the tunnel by horizontal boards, called breast boards, wedged back to
the last frame placed. The excavation is performed by removing one board
at a time, excavating behind it and then replacing it in the advance
position. The advance is made from the top downwards. This represents
the method pursued in the most difficult material where wooden sheeting
without a shield is used. The timbering during the advance may be
modified in any manner that the character of the material will permit.
The timbering may lag behind the excavation a distance of two or more
frames, or it may be omitted altogether. Heavier timbering may be
necessary in soft, slipping or shattered rock.
[Illustration:
FIG. 118.—Shield for Driving Milwaukee Sewer Tunnel.
Eng. News-Record, Vol. 80, 1918, p. 669.
]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account