driven or pushed into the cement joints of the last completed section.
Between work done on separate days the bricks are racked back in courses
to provide a satisfactory bond.
[Illustration:
FIG. 126.—Profile for Brick Sewers.
]
In ground too soft to support the brickwork directly a cradle is
prepared by placing profiles in position in the sewer and nailing 2–inch
planks to these profiles, first firmly tamping earth under the planks.
The bricks are laid in this cradle in a manner similar to that explained
for sewers with a firm foundation. In still softer ground it may be
necessary to construct a concrete cradle to support the bricks.
=184. The Arch.=—The arch centering consists of a wooden form made up of
wooden ribs as shown in Fig. 127. The center conforms to the shape of
the inside of the arch with allowance for the thickness of the lagging.
The lagging is nailed on the ribs in straight strips parallel to the
axis of the sewer. The center is supported on triangular struts resting
against the sides and on the bottom of the sewer and is lifted into
position by wedges driven between it and the support. The centers may be
placed immediately after the completion of the invert, or a day or two
may be allowed to pass to give the invert an opportunity to set. After
the centers are fixed in place the arch brick are carried up evenly on
each side and are pounded firmly into place. The center is usually, but
not always “struck” immediately, and the arch brick are cleaned and
pointed up from the inside. The outside is covered with a layer of ¼ to
¾ of an inch of cement mortar and may be backfilled to the top of the
arch in order to maintain the moisture of the mortar during setting and
to press the bricks of the arch together firmly. The centers are
sometimes made collapsible so that they can be carried or rolled through
the finished brickwork to the advanced position. In “striking” the
centers the wedges are removed and the wings folded in.
[Illustration:
FIG. 127.—Centering for Brick Sewer.
]
In tunneling, the invert of the sewer is constructed in the same fashion
as for open cut work. The arch centering is made in short sections and
the bricks are put in position by reaching in over the end of the
centering. All of the timbering of the tunnel is removed except the
poling boards or lagging against which the bricks or mortar are tightly
pressed, the boards being bricked in permanently.
=185. Block Sewers.=—Sewers made of unit blocks of concrete or vitrified
clay are constructed in a similar manner to brick sewers. Fig. 128 shows
the construction of a block sewer at Clinton, Iowa. In this sewer there
are two rings; an inside one of solid blocks and an outside one of
hollow blocks. Block sewers do not demand the skill in construction that
is demanded by brick sewers, as the blocks are so cast that the joints
are radial, whereas only experienced masons can lay bricks radially.
[Illustration:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account