Sewerage and Sewage TreatmentBabbitt, Harold E. (Harold Eaton)
History
Sewerage and Sewage Treatment
Babbitt, Harold E. (Harold Eaton)
Sewage disposal; Sewerage
90. Materials. 91. Vitrified Clay Pipe. 92. Cement and Concrete
Pipe. 93. Proportioning of Concrete. 94. Waterproofing of
Concrete. 95. Mixing and Placing Concrete. 96. Sewer Brick.
97. Vitrified Clay Sewer Block. 98. Cast Iron, Steel, and
Wood. 164–193
CHAPTER IX
DESIGN OF THE SEWER RING
99. Stresses in Buried Pipe. 100. Design of Steel Pipe. 101.
Design of Wood Stave Pipe. 102. External Loads on Buried
Pipe. 103. Stresses in Circular Ring. 104. Analysis of Sewer
Arches. 105. Reinforced Concrete Sewer Design. 194–210
CHAPTER X
CONTRACTS AND SPECIFICATIONS
106. Importance of the Subject. 107. Scope of the Subject. 108.
Types of Contracts. 109. The Agreement. 110. The
Advertisement. 111. Information and Instructions for Bidders.
112. Proposal. 113. General Specifications. 114. Technical
Specifications. 115. Special Specifications. 116. The
Contract. 117. The Bond. 211–232
CHAPTER XI
CONSTRUCTION
118. Elements. WORK OF THE ENGINEER. 119. Duties. 120.
Inspection. 121. Interpretation of Contract. 122. Unexpected
Situations. 123. Cost Data and Estimates. 124. Progress
Reports. 125. Records. EXCAVATION. 126. Specifications. 127.
Hand Excavation. 128. Machine Excavation. 129. Types of
Machines. 130. Continuous Bucket Excavators. 131. Cableway
and Trestle Excavators. 132. Tower Cableways. 133. Steam
Shovels. 134. Drag Line and Bucket Excavators. 135.
Excavation in Quicksand. 136. Pumping and Drainage. 137.
Trench Pump. 138. Diaphragm Pump. 139. Jet Pump. 140. Steam
Vacuum Pumps. 141. Centrifugal and Reciprocating Pumps. 142.
Well Points. 143. Rock Excavation. 144. Power Drilling. 145.
Steam or Air for Power. 146. Depth of Drill Hole. 147.
Diameter of Drill Hole. 148. Spacing of Drill Holes. SHEETING
AND BRACING. 149. Purposes and Types. 150. Stay Bracing. 151.
Skeleton Sheeting. 152. Poling Boards. 153. Box Sheeting.
154. Vertical Sheeting. 155. Pulling Wood Sheeting. 156.
Earth Pressures. 157. Design of Sheeting and Bracing. 158.
Steel Sheet Piling. LINE AND GRADE. 159. Locating the Trench.
160. Final Line and Grade. 161. Transferring Grade and Line
to the Pipe. 162. Line and Grade in Tunnel. TUNNELLING. 163.
Depth. 164. Shafts. 165. Timbering. 166. Shields. 167. Tunnel
Machines. 168. Rock Tunnels. 169. Ventilation. 170.
Compressed Air. EXPLOSIVES AND BLASTING. 171. Requirements.
172. Types of Explosives. 173. Permissible Explosives. 174.
Strength. 175. Fuses and Detonators. 176. Care in Handling.
177. Priming, Loading, and Firing. 178. Quantity of
Explosive. PIPE SEWERS. 179. The Trench Bottom. 180. Laying
Pipe. 181. Joints. 182.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account