Sewerage and Sewage TreatmentBabbitt, Harold E. (Harold Eaton)
History
Sewerage and Sewage Treatment
Babbitt, Harold E. (Harold Eaton)
Sewage disposal; Sewerage
Labor and Progress. BRICK AND BLOCK
SEWERS. 183. The Invert. 184. The Arch. 185. Block Sewers.
186. Organization. 187. Rate of Progress. CONCRETE SEWERS.
188. Construction in Open Cut. 189. Construction in Tunnels.
190. Materials for Forms. 191. Design of Forms. 192. Wooden
Forms. 193. Steel-lined Wooden Forms. 194. Steel Forms. 195.
Reinforcement. 196. Cost of Concrete Sewers. BACKFILLING.
197. Method. 233–331
CHAPTER XII
MAINTENANCE OF SEWERS
198. Work Involved. 199. Causes of Troubles. 200. Inspection.
201. Repairs. 202. Cleaning of Sewers. 203. Flushing Sewers.
204. Cleaning Catch-basins. 205. Protection of Sewers. 206.
Explosions in Sewers. 207. Valuation of Sewers. 332–351
CHAPTER XIII
COMPOSITION AND PROPERTIES OF SEWAGE
208. Physical Characteristics. 209. Chemical Composition. 210.
Significance of Chemical Constituents. 211. Sewage Bacteria.
212. Organic Life in Sewage. 213. Decomposition of Sewage.
214. The Nitrogen Cycle. 215. Plankton and Macroscopic
Organisms. 216. Variations in the Quality of Sewage. 217.
Sewage Disposal. 218. Methods of Sewage Treatment. 352–371
CHAPTER XIV
DISPOSAL BY DILUTION
219. Definition. 220. Conditions Required for Success. 221.
Self-purification of Running Streams. 222. Self-purification
of Lakes. 223. Dilution in Salt Water. 224. Quantity of
Diluting Water Needed. 225. Governmental Control. 226.
Preliminary Treatment. 227. Preliminary Investigations. 372–382
CHAPTER XV
SCREENING AND SEDIMENTATION
228. Purpose. 229. Types of Screens. 230. Sizes of Openings.
231. Design of Fixed and Movable Screens. PLAIN
SEDIMENTATION. 232. Theory of Sedimentation. 233. Types of
Sedimentation Basins. 234. Limiting Velocities. 235. Quantity
and Character of Grit. 236. Dimensions of Grit Chambers. 237.
Existing Grit Chambers. 238. Number of Grit Chambers. 239.
Quantity and Characteristics of Sludge from Plain
Sedimentation. 240. Dimensions of Sedimentation Basins.
CHEMICAL PRECIPITATION. 241. The Process. 242. Chemicals.
243. Preparation and Addition of Chemicals. 244. Results. 383–409
CHAPTER XVI
SEPTICIZATION
245. The Process. 246. The Septic Tank. 247. Results of Septic
Action. 248. Design of Septic Tanks. 249. Imhoff Tanks. 250.
Design of Imhoff Tanks. 251. Imhoff Tank Results. 252. Status
of Imhoff Tanks. 253. Operation of Imhoff Tanks. 254. Other
Tanks. 410–430
CHAPTER XVII
FILTRATION AND IRRIGATION
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account