The American Railway: Its Construction, Development, Management, and AppliancesClarke, Thomas Curtis
History
The American Railway: Its Construction, Development, Management, and Appliances
Clarke, Thomas Curtis
Railroads -- United States
This schedule is all that is needed so long as all trains are
able to keep on time, and there are no extras. Trouble begins
when regular trains cannot keep on schedule, or when extra
trains have to be sent out, not provided for on the schedule. A
diagram, or graphic representation of this schedule, upon a board
or large sheet of paper, is an important feature of the office
regulating train-movements. Twenty-four vertical lines divide the
board into equal spaces representing the twenty-four hours of
the day, numbered from midnight to midnight. Horizontal lines at
proportionate distances from the top represent the stations in
their order between the termini, represented by the top and bottom
lines of the diagram. The course of every train can now be plotted
on this diagram in an oblique line joining the points on each
station line corresponding to the time the train arrives at and
leaves that station. The cut on the opposite page will illustrate.
It represents a road 130 miles long from A to N, with intermediate
stations B, C, D, etc., at different distances from each other, and
six trains are shown as follows:
A passenger train, No. 1, leaving A at 12 midnight and arriving
at N at 4.05 A.M. A fast express, No. 2, leaving N at 12.45 and
arriving at A at 3.30. A local passenger train, No. 4, which leaves
N at 1.15, runs to E by 4 A.M., stops there until 4.10, and returns
to N by 7 A.M.; being called No. 3 on the return, as the direction
is always indicated by the train-number's being odd or even. No. 5
is a way freight, leaving A at 12.05 and making long stops at each
station. No. 6 is an opposing train of the same character.
[Illustration: Diagram Used in Making Railway Time-Tables.]
[Illustration: A lamp swung across the track is the signal to stop.]
The diagram shows at a glance how, when, and where all these
trains meet and pass each other, and where every train is at any
moment. Should it be desired to send an extra train at any time, a
line drawn or a string stretched on the board will indicate what
opposing trains must be guarded against. For instance, to send
an extra through in three hours, leaving A between 1 and 2 A.M.,
a trial line will show that Nos. 5, 2, 4, and 6 must all be met
or passed, and as (on a single-track road) this can only be done
at stations, the extra must leave at 1.35 A.M., pass No. 5 at E,
meet No. 2 at F, No. 4 at I, and No. 6 at J. A dotted line on
the diagram indicates its run, and that No. 2 is held at F for 5
minutes to let it pass. If the road is double-tracked, only trains
going in the same direction need be regarded.[16]
[Illustration: A lamp raised and lowered vertically is the signal
to move ahead.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account