It will be seen that most of the great saving of time in modern
construction of bridges and other parts of railways is due to
improved machinery. The engineer of to-day is probably not more
skilful than his ancestor, who, in periwig and cue, breeches
and silk stockings, is represented in old prints supervising a
gang of laborers, who slowly lift the ram of a pile-driver by
hauling on one end of a rope passed over a pulley-wheel. The
modern engineer has that useful servant, steam, and the history
of modern engineering is chiefly the history of those inventions
by which steam has been able to supersede manual labor--such as
pile-drivers, steam-shovels, steam-dredges, and other similar tools.
[Illustration: General View of the Poughkeepsie Bridge.]
* * * * *
After the road-bed of a railway is completed and covered with a
good coat of gravel or stone-ballast, and after all the temporary
structures have been replaced by permanent ones, that part of the
work may be said to be done, requiring only that the damages of
storms should be repaired. But the track of a railway is never
done. It is always wearing out and always being replaced.
[Illustration: Erection of a Cantilever.]
Some of the early English engineers, not appreciating this,
endeavored to lay down solid stone walls coped with stone cut to a
smooth surface, on which they laid their rails. They called this
"permanent way," as distinguished from the temporary track of rails
and cross-ties used by contractors in building the lines. But
experience soon showed that the temporary track, if supported by
a bed of broken stone, always kept itself drained and was always
elastic, and remained in much better order than the more expensive
so-called "permanent way." When the increase in the weight of our
rolling stock began to take place, dating from about 1870, iron
rails were found to be wearing out very fast. Some railway men
declared that the railway system had reached its full development.
But in this world the supply generally equals the demand. When a
thing is very much wanted, it is sure to come, sooner or later.
The process of making steel invented by, and named after, Henry
Bessemer, of England, and perfected by A. L. Holley, of this
country, gave us a steel rail which at the present time costs
less than one of iron, and has a life five or six times as long,
even under the heavy loads of to-day. We are now approaching very
near the limit of what the rail will carry, while the joints are
becoming less able to do their duty. Bad joints mean rough track.
Rough track means considerably greater expenditure both for its
maintenance and that of all the rolling stock, as the blows and
shocks do reciprocal damage, both to the rails and to that which
runs on them. Hence all railway managers are now devoting more care
and attention to their tracks.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account