In laying track on a new railway, if it be in an old-settled
country where other railroads are near and the highways good,
the ties are delivered in piles along the line where wanted, and
the haul of the rails is comparatively short. The ties are laid
down, spaced and bedded, adzed off to a true bearing, and the
rails laid upon them; the workmen being divided into gangs, each
doing a different part of the work. After the track is laid, the
ballast-trains come along and cover the roadbed with gravel. The
track is raised, the gravel tamped well under the ties, and the
track is ready for use.
[Illustration: Spiking the Track.]
[Illustration: Rail Making.]
The road is then divided into sections about five miles long. On
each section there is a section-boss, with four to six laborers.
Their duty is to pass over the track at least twice a day in their
hand-car, to examine every joint, and where one is found low or out
of line, to bring it back to its true position by tamping gravel
under it and moving the track. They have also to see that all
ditches are kept clear of water, a most essential point, as without
good drainage the ground under gravel ballast becomes soft, and the
mud is churned up into the gravel, and the whole soon gets into bad
order.
They have to see that the fences are all right, that trees and
telegraph poles do not fall across the track, that wooden bridges
do not burn down, that iron and stone bridges are not undermined by
freshets, and always to set up danger signals to warn the trains.
[Illustration: Track Laying.]
It is admitted by competent judges, that the track of the
Pennsylvania Railroad is the best in this country, and one of the
best in the world. It is kept up to its high standard of excellence
by a system of competitive examinations.
About the first of November, in each year, after the season's work
has been done, a tour of inspection is made over all the lines, on
a train of cars expressly prepared, consisting of two or more cars
not unlike ordinary box cars with the front end taken out. Each car
is pushed in front of an engine, and goes slowly over the line, by
daylight only, so that the inspecting party may have a full view of
the road.
The Pennsylvania road is divided into Grand Divisions,
Superintendents' Divisions, of about 100 miles long, Supervisors'
Divisions, of about 30 miles, and Subdivisions, of 2½ miles.
The examining committee for each Supervisor's Division consists of
the supervisors of other divisions. As they pass along, they mark
on a card. One sub-committee marks the condition of the alignment
and surfacing of the rails; another the condition of the joints
and the spacing of the ties; another the ballast, switches, and
sidings; another the ditches, road-crossings, station grounds.
The marks range from 0 to 10, 0 being very bad, 5 medium, and 10
perfection. When the trip is done these reports are all collected
and the average is taken for each division.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account