But the work for certain sections of the upper part of the river is
more complicated as about fifty or sixty miles of solid land of from
ten to twenty feet above water level and thirty to forty feet below
have to be cut in order to straighten the river's course. Of this
cutting and removing work, how much will have to be done artificially
and how much can be done by nature, I leave to the experts to estimate.
Excepting this, the other parts of this work, I think, cannot cost
much more than $400,000 a mile. So that the whole work from the sea to
Hankow, a distance of 630 miles will cost about $252,000,000, or let
us say, including the unknown part, $300,000,000 for the completion of
the entire project for the regulating of the Yangtze River. By this
regulating of the Yangtze River, we secure an approach of 600 miles
inland for ocean-going vessels into the very center of a continent
of two hundred millions of people of which half or one hundred million
is located immediately along 600 miles of the great water highway. As
regards remuneration for the work, this project will be more profitable
than either the Suez or Panama Canal.
[Illustration: MAP X]
Although we could not find means whereby the works above Kiangyin may
be made self-paying as those of the sections below by the reclamation
of land, profit from city building along the course of the river can be
realized after the regulating work is completed.
In conclusion, I must say that the figures given concerning the harbor
works and the Yangtze regulation are merely rough estimates which
must be in the nature of the case. As regards the costs of building
the rudimental dikes at the estuary of the Yangtze as well as along
the dilating parts of the river, the estimation may seem too low. But
the data on which I base my estimate are as follows: First, my own
observation of the private enterprise of reclamation by building dikes
at the Canton delta around my native village; second, the cheap stone
that can be obtained at the Chusan Archipelago; third, the estimation
of Mr. Tyler, Coast Inspector of the Maritime Customs for the blocking
up of the North Channel at the upper end of Tsungming Island, where the
narrowest part is about three miles. He says that a million taels or
more is necessary for the work. Or, let us say, in round figures, five
hundred thousand dollars (Mex.) a mile. This is two and a half times
my estimate. Now, let us compare the difference. The three-mile channel
at the upper end of Tsungming has an average depth of twenty feet of
water, while in my project the sea wall or dikes will be built in water
having an average of less than two thirds of this depth. Moreover, the
work of blocking up the North Channel entirely at a right angle is many
times more costly than that of building a rudimental dike of the same
length in a parallel line with the current. Since five hundred thousand
dollars are enough to block up cross-wise a mile of river twenty feet
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account