_August 19._--Engaged at home in revising my plans for the manner
of carrying on the horizontal excavation, more particularly of
penetrating through the shaft. This part of the operation requires
_indeed_ very great attention, as it presents great difficulties,
arising from the wall to be broken through, and chiefly from the
angular opening that is to be made at each extremity. Then another
consideration is the uniting the brick arches to the brickwork of
the shaft.
_September 16._--Engaged in the early part of the day on revising
my plans of future operations in the Tunnel work, and in adapting
them to the nature of the ground as it is found at the various
depths we have penetrated: namely, to about 73 feet. Went
afterwards to Maudslay to request that the great shield may be
completed.
[Sidenote: Great shield.]
_October 14._--Engaged in the early part of the morning in making
some arrangements for the working of the great shield. Too much
attention cannot be given to that subject at the early part; for,
when once in its place, it would be extremely inconvenient to make
any alteration.
[Sidenote: Preparing for the frames.]
_October 15._--The dome of the reservoir will be covered to-day
about noon; the bottom of the shaft will therefore be completed.
They are now preparing to apply two frames of the shield. The
ground now open in the front is remarkably hard; it consists of
pebbles imbedded in a chalky substance, with hard loose stones of
the nature of the Kentish rag. Everything is going on well. Devised
with Isambard how to make our wells for the descent of the
materials, &c.
Thus at last the shaft was completed, and Sir Isambard was able to
commence the Tunnel itself, which he ultimately determined to construct
in the form of a rectangular mass of brickwork, 37½ feet wide and 22
feet high, pierced by two parallel horseshoe archways, each 14 feet wide
and 17 feet high.
Before entering upon the history of this undertaking, some account must
be given of the machine which Sir Isambard Brunel devised for effecting
its accomplishment.
In order to avoid a quicksand of considerable depth and extent, the
Tunnel had to be carried but a short distance below the bed of the
river; and, as in all tunnelling through soft soil,[11] the top and
sides of the excavation had to be supported until the brickwork was
built in; and the front or face had also to be held up as the miners
advanced. This support was given by means of a machine called ‘the
shield,’ described on one occasion by Sir Isambard as ‘an ambulating
cofferdam, travelling horizontally.’[12]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account