The miner, standing in his cell, took down one, or, at the most, two of
the poling-boards, commencing at the top of the cell, and having
excavated the earth a few inches in advance, replaced the poling-boards
against the newly-formed face, pressing them against it with the
poling-screws. Thus the excavation was carried on without depriving the
ground of the support it received from the shield, except at the point
where the miner was actually at work.
The operation of advancing the frames was effected in the following way.
When everything was ready for a move, one of the feet which carried the
frames on jointed legs was lifted up, and advanced forward a few inches,
and then pressed down on to the ground, until in its new position it
again bore the weight of the frame. This done, the other foot was
lifted, moved forward, and screwed down in the same manner, and then the
frame itself was pushed ahead by means of the large abutting screws,
which kept it top and bottom from being forced back on the brickwork.
It is, however, evident that these abutting screws would have been
unable to push on the frame, while the ground in front was pressing back
the poling-boards against it; therefore, during the process of moving a
frame, it had to be relieved from the thrust of its poling-screws.
Accordingly, when it was desired to advance any one of the frames, the
butts of the poling-screws of the tier of boards in front of it were
shifted sideways, so as to rest, not against the frame to which they
belonged, but against the frames next it on either side. This done, the
frame itself was advanced, and was then ready to receive again its own
poling-screws, and also those belonging to the adjoining frames, so that
they might in their turn be moved forward. It will thus be seen that the
whole shield was not moved forward at one time, but that the frames were
advanced alternately.
There were many other ingenious arrangements in the design of the
shield, which need not be referred to in a description intended only to
give such a general idea of the machine as may make the history of its
operation intelligible.[13]
When the frames had been completed in Messrs. Maudslay’s factory, they
were conveyed to Rotherhithe, and lowered down the shaft. An opening had
been left at the bottom of the wall, about 37 feet wide by 22 feet high,
and against this the shield was erected. It was then ready to commence
its progress through the ground below the river.
On November 25, 1825, the shield made its first start. Sir Isambard was
unfortunately unable to witness what was in fact the actual commencement
of the Tunnel, as he had three days before been seized with a sudden and
alarming attack of illness, which kept him at home till December 6. The
works were left under the direction of Mr. Brunel.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account