_December 8._--The great shield is advancing very slowly, meeting
with much interruption by the water, which still runs within the
cells, and also by the difficulty of forming abutments for the
frames. [_Temporary abutments were necessary until the shield was
sufficiently advanced to allow of its being pushed forwards from
the brickwork built up behind it._]
_December 29._--The frames are very much out of level in the
transverse line of the Tunnel. This would be attended with serious
inconvenience if I had not provided for the means of recovering any
irregularity that might take place, and which, as it appears,
cannot perhaps be prevented; but having foreseen this, I have
provided the remedy by being able to take down the top of each
frame, and to remove the top staves in parts, or the whole, at
pleasure--a very important provision it proves to be.
_January 16, 1826._--Too much precaution cannot be taken, in the
management of the frames, to have the leg-screw particularly well
secured, as every foot-run of the arch of the Tunnel sustains 82
tons. Each frame carries as follows:--
The two end frames each 65 tons = 130
Ten others, each 52½ " = 525
---
655 tons.
_January 21._--The ground at the top and sides very good; same in
the front. In breaking the ground out of the limits of the shield
on the right a great deal of ground fell in. This indicates that,
if it was not for the protection of the shield, nothing could be
done. This accounts also for the occasional breaking of the ground
in making the drift in 1809.
[Sidenote: Tunnel begun.]
The brickwork of the entrance being carried as far as directed, the
body of the Tunnel was begun to-day.
[Sidenote: Water broke into the works.]
_January 26._--Isambard went down to Rotherhithe; the water had
broken in in great abundance upon the work over Nos. 4 and 5. [_The
twelve frames were distinguished by numbers._] A 4-inch pipe was
driven over the shield from inside the shaft, but the water did not
follow it, and the stream augmented very rapidly. The frame No. 5
was moved forward, and it checked the water for a moment, but it
came again with violence. A heading was immediately ordered by
Armstrong [_the resident engineer_] from the east well, in which
Isambard concurred.
_February 3_.--Ordered a pit to be opened and made by sinking a curb 8
feet diameter and 18 inches thick, well bound with bolts. [_This pit was
a well sunk from the surface to enable the gravel containing water, into
which the head of the shield had penetrated, to be removed, and clay
substituted_.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account