_February 6_.--The shaft begun last night, and was sunk 20 feet to-day,
and remarkably true. Had we known the ground as we now know it, we
might, by having opened a well contiguous to the great shaft, have sunk
the shaft in a week; but for that purpose we must have had two steam
engines, one for pumping the water, and the other for taking up the
ground.
[Sidenote: Unremitted attention wanted.]
_February 10_.--Went very early to the Tunnel for the purpose of giving
directions to prop up the back of the staves, which, for want of weight
at the new shaft, might be overbalanced by the pressure of the ground at
the back. I could not rest a moment until it was done, for the
consequences might have been fatal, at this moment in particular. What
incessant attention and anxiety! To be at the mercy of ignorance and
carelessness! No work like this.
[Sidenote: Observations on the mode adopted to check the water.]
_February 12_.--The ground having been opened carefully from under the
curb of the pit [_see above on date February 3_], the greater part of
the gravel was removed, and stiff clay substituted for it. This was done
by driving first some wrought-iron flat bars, which kept the ground up.
This shows that the shield is a most powerful protection, and would
enable us to penetrate through a bed of gravel. Though the breaking in
of the water had somewhat terrified the man in No. 5, he soon returned
to his post, and the others have acknowledged their full confidence in
the security afforded by the shield. The boring ahead had not yet been
attended to: it is owing to the want of this precaution that this
accident is chiefly to be ascribed; for had we known as much as we now
do, we might have passed through without the pit being opened.
_March 1_.--Water at the back of the frames, but less than before. The
men show a great deal of spirit in overcoming the present difficulties.
Isambard was very busy yesterday and to-day in the frames, and about the
works. He was severely hurt in the leg by a piece of timber falling
against it. [_This accident prevented his attending again at the Tunnel
until the 24th_.]
On March 6 the proprietors paid a visit to the Tunnel, and were highly
satisfied with what they saw. On that evening Sir Isambard writes:--
It is of absolute necessity _now_ to provide for everything that is
conducive to the more expeditious management of the frames, and to
a greater facility in getting up the brickwork. If these two points
are realized, then indeed we may soon expect to be moving at a good
rate--not less than I have held out, namely, 3 feet per 24 hours.
[Sidenote: Water stopped as expected.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account