That problem consisted, for one thing, in the practical use of a
locomotive around curves of 400 feet radius. Cooper went back to New York,
bought an engine with a single cylinder, rigged it on a car--not larger
than a hand-car, geared it to the wheels of that car and solved the chief
problem of the B. & O. His little engine--the _Tom Thumb_--was a primitive
enough affair, but it pointed the way to these Baltimore merchants who
were pinning their entire faith to their railroad project.
* * * * *
Two years after the beginning of the work, "brigades" of horse-cars were
in regular service to Ellicott's Mills; by the first of December, 1831,
trains--steam-drawn--ran through to Frederick, Md.; five months later, to
a day, they had reached Point of Rocks on the Potomac, seventy miles from
Baltimore. At Point of Rocks the road was halted for a long time. The
power of the powerful Chesapeake & Ohio Canal, which had been great enough
to keep State or national grants from struggling railroads, was raised to
defend its claim to a monopoly of the Potomac Valley, by right of
priority. This right was sustained in the courts, and the railroad held
back two years, until it could buy a compromise.
In 1835, a highly profitable branch was opened to Washington, while early
in the following year, trains were running through to Harpers Ferry, at
the mouth of the Shenandoah.
During that same Summer of 1835, definite steps were taken toward the
extension of the railroad to Pittsburgh, as well as Wheeling. But it was
three years later before the struggling company was ready to make a
surveying reconnaissance of these extensions of the road. All through that
time actual construction work was slowly but quite surely progressing
westward from Harpers Ferry, and on November 5, 1842, trains entered
Cumberland, the one-time objective point of the enterprise.
[Illustration: AN EARLY LOCOMOTIVE BUILT BY WILLIAM NORRIS FOR THE
PHILADELPHIA & READING RAILROAD]
[Illustration: THE HISTORIC "JOHN BULL" OF THE CAMDEN & AMBOY
RAILROAD--AND ITS TRAIN]
[Illustration: A HEAVY-GRADE TYPE OF LOCOMOTIVE BUILT FOR THE BALTIMORE &
OHIO RAILROAD IN 1864. ITS FLARING STACK WAS TYPICAL OF THOSE YEARS]
But beyond Cumberland the road gradually left the comfortable valley of
the Potomac, and these early railroad builders found themselves confronted
with new difficulties. To build a railroad across the range of the
Appalachians, with the primitive methods and machinery of those days was
no simple task. For nine years the construction work dragged. In 1851 the
line had only been finished to Piedmont, twenty-nine miles west of
Cumberland, and its builders were well-nigh discouraged. Let us quote from
the ancient history of the B. & O., from which we derive these facts, in
an exact paragraph:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account