Of course, if the country has a sharp contour, the ordinary difficulties
of line-construction multiply very rapidly. The great cuttings through the
hills may have to be carved out of resisting rock, a work that is carried
on through many levels, known to the engineers as ledges or as benches. If
there are high hills to be notched there will probably be great hollows
where the circumstances do not justify carrying the line on bridge or
trestle. In these cases come the fills, or embankments. We have already
shown how the locating engineer in the first instance has tried to plan
his line so that the earth or rock from his cutting will be as nearly as
possible sufficient to form the near-by embankments. Sometimes it is not,
and then the resident engineers must locate borrow-pits, where the hungry
demand of the railroad for dirt will cause a great hollow to show itself
on the face of the earth. The borrow-pit must be carefully
located--convenient of access, far enough from the track not to be a
danger spot to it. This is one of the infinity of problems that come to
the construction engineer.
For these big jobs laborers' camps will be established close to them; and
small temporary railroads peopled with hordes of restless dummy-engines
and forcing their narrow-gauged rails here and there and everywhere, will
be busy for long weeks and months. There will not be much hand-cutting in
the ledges. Steam shovels, mounted like locomotives upon the rails, and
pushing forward all the while, will fairly eat out the hillside. One of
these will catch up in a single dip of his giant arm more than a wagon
load of soft earth or of rock that has been blasted apart for his coming.
To make the fills the engineers must often build rough wooden trestles out
of the permanent level of the line. The dummy-engines, with their trails
of dump-cars, coming from the back of the steam shovels in the cutting, or
from the nearest borrow-pit, will hardly seem in a single day to make an
appreciable effect upon the fill. But the days and weeks together count,
and the dumping multiplies until the rough trestle has completely
disappeared, and the railroad has a firm and permanent path across the
edge of the dizzy embankment. And these embankments can be made truly
dizzy. The passenger going west from Omaha on the new Lane cut-off of the
Union Pacific finds his path for almost twenty miles through deep cuttings
of the crests of the rolling Nebraska hills, across the edge of the long
fills over wide valleys. The Lackawanna railroad building a great
cut-off on its main line where it passes through New Jersey has just
finished the largest railroad embankment ever built--an earthen structure
for two tracks, three miles long and seventy-five to one hundred and ten
feet in height.
[Illustration: CUTTING A PATH FOR THE RAILROAD THROUGH THE CREST OF THE
HIGH HILLS]
[Illustration: A GIANT FILL--IN THE MAKING]
[Illustration: THE FINISHING TOUCHES TO THE TRACK]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account