At the station on 42d Street, between Park and Madison Avenues, where
there are five subway tracks, and along 42d Street to Broadway, a
special method of construction was employed which was not followed
elsewhere. The excavation here was about 35 feet deep and extended 10
to 15 feet into rock. A trench 30 feet wide was first sunk on the
south side of the street and the subway built in it for a width of two
tracks. Then, at intervals of 50 feet, tunnels were driven toward the
north side of the street. Their tops were about 4 feet above the roof
of the subway and their bottoms were on the roof. When they had been
driven just beyond the line of the fourth track, their ends were
connected by a tunnel parallel with the axis of the subway. The rock
in the bottom of all these tunnels was then excavated to its final
depth. In the small tunnel parallel with the subway axis, a bed of
concrete was placed and the third row of steel columns was erected
ready to carry the steel and concrete roof. When this work was
completed, the earth between the traverse tunnels was excavated, the
material above being supported on poling boards and struts. The roof
of the subway was then extended sidewise over the rock below from the
second to the third row of columns, and it was not until the roof was
finished that the rock beneath was excavated. In this way the subway
was finished for a width of four tracks. For the fifth track the earth
was removed by tunneling to the limits of the subway, and then the
rock below was blasted out.
[Illustration: MOVING WEST SIDE WALL TO WIDEN SUBWAY FOR THIRD
TRACK--135TH STREET AND BROADWAY]
[Illustration: SUBWAY THROUGH NEW "TIMES" BUILDING, SHOWING
INDEPENDENT CONSTRUCTION--THE WORKMEN STAND ON FLOOR GIRDERS OF
SUBWAY]
[Illustration: COLUMNS OF HOTEL BELMONT, PASSING THROUGH SUBWAY AT 42D
STREET AND PARK AVENUE]
In a number of places it was necessary to underpin the columns of the
elevated railways, and a variety of methods were adopted for the work.
A typical example of the difficulties involved was afforded at the
Manhattan Railway Elevated Station at Sixth Avenue and 42d Street. The
stairways of this station were directly over the open excavation for
the subway in the latter thoroughfare and were used by a large number
of people. The work was done in the same manner at each of the four
corners. Two narrow pits about 40 feet apart, were first sunk and
their bottoms covered with concrete at the elevation of the floor of
the subway. A trestle was built in each pit, and on these were placed
a pair of 3-foot plate girders, one on each side of the elevated
column, which was midway between the trestles. The column was then
riveted to the girders and was thus held independent of its original
foundations. Other pits were then sunk under the stairway and trestles
built in them to support it. When this work was completed it was
possible to carry out the remaining excavation without interfering
with the elevated railway traffic.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account