The distinguishing features of the ends of the canal are the big
breakwaters at Toro Point, at the Atlantic end, and Naos Island, at
the Pacific end. The former extends from the shore out into the sea
for a distance of 2 miles and has a large lighthouse at the seaward
end. It was built by dumping stone from the shore out into the sea,
this process being followed by driving piles into the dumped stone and
building a railroad on the crest, over which the stone was hauled for
its further extension. The top of the breakwater is covered with huge
stones weighing from 8 to 20 tons each, these to make sure that it
will stand against the pounding of the waves. Two minor breakwaters
were also built at the Atlantic end to protect the terminal basin.
The big dike at Naos Island in the Pacific is more than 17,000 feet
long and transforms the island into the cape of a small peninsula.
There was a threefold purpose in its construction--to cut out the
cross currents that brought thousands of yards of sand and silt into
the canal channel, to afford a dumping place for a large quantity of
the spoil from Culebra Cut, and to make a connection with the mainland
for the fortifications on Naos, Flamenco, and Perico Islands. In
building it the engineers were under the necessity of first building a
trestle on which the spoil trains could be backed and dumped. The
piles had to be driven in soft, blue mud, and as the rock was dumped,
it sank down and down until, at places, ten times as much stone was
required as would have been necessary if the ocean bottom had been
firm. In addition to this thousands of trainloads of material were
dumped in the landward end of the dike, some 20,000,000 cubic yards of
material being thus disposed of.
The last part of the canal work to be completed will be the terminal
facilities at the ends of the big waterway. At the time this book went
to press they were something more than a year from completion, but the
indications were that they would be finished within the time limit
originally set for the completion of the canal itself. These terminal
facilities consist of dry docks, wharfage space, storehouses, and
everything else necessary to perform any service that might ordinarily
be required for passing ships, whether they be those of commerce or of
war. The main coaling station is to be established at the Atlantic
end. The storehouses, the laundry, the bakery, and the other equipment
of the Isthmian Canal Commission and the Panama Railroad also will be
made a part of the permanent terminal plant on that side of the
Isthmus.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account