_Ramapo River._--The greatest destruction was along the Ramapo. It is
the largest of the upland branches, and was therefore the heaviest
contributor to the main stream. Throughout the flood period the stream
was especially violent, causing great apprehension in the lower valley.
The destruction along several stretches of the valley was almost
complete. Nearly all the dams failed, and every bridge across the river,
with one exception, was carried away. Some small villages were swept
bare, and the damages to realty value and personal property were
excessive.
It was only by strenuous measures that the dam impounding the waters of
Tuxedo Lake was saved. If this had failed the destruction along the
entire course of the river, even to the cities in the lower valley,
would have been enormously increased.
The dam at Cranberry Pond, in Arden, failed in the early part of the
storm, the flood waters disabling the Tuxedo electric-light plant and
inundating the Italian settlements along the river below. The failure of
the dam conserving the waters of Nigger Pond, which lies at the head of
a small tributary emptying into the Ramapo below Tuxedo, resulted in the
inundation of Ramapo village. The village of Sloatsburg was practically
obliterated.
The damage at Pompton Lakes was especially severe. During the early part
of the flood the timber dam of the Ludlum Steel and Iron Company, which
raised the water to a height of 27 feet, and afforded 7.04 horsepower
per foot fall, was carried away with a part of the headrace. (See Pl.
II, _A._) This sudden emptying of Pompton Lake, an expanse of 196 acres
(see Pl. II, _B_), was extremely destructive to Pompton Plains, and the
destruction of the dams above on Ramapo River, which followed some time
after the bursting of the lower dam, refilled Pompton Lake above its
former level, and caused greater damage than that which resulted from
the failure of Pompton dam itself. The large iron bridge just below the
dam was carried away, with the stores of the Ludlum Steel and Iron
Company. The river front along this company's property was destroyed,
along with coal docks at the head of Morris Canal feeder. The channel of
the river below the dam is filled with debris, which will raise the
height of the water in the tailrace, and unless it is cleared will
diminish the available power at the iron works. It has been
authoritatively announced, however, that the power facilities will not
be restored, as the Ludlum Steel and Iron Company is preparing to use
steam power exclusively.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account