_Passaic and vicinity._--Below the city of Paterson destruction was as
complete as in Paterson, although the damage was not as great because
the improvements were not as valuable. Damage to property, exclusive of
public works, in this region, amounted to about $1,250,000. This
estimate does not take into consideration losses by manufacturers
arising from destruction of raw materials or finished products. The
flood was about 4-1/2 feet higher than that of 1902. (See Pl. VII, _A._)
On the right bank of Passaic River, in the city of Passaic, the damage
was severe, especially to manufacturing plants. In addition to the flood
in the Passaic itself, the bursting of Morris Canal, a few miles east of
Passaic, flooded Wesel Brook, which in Passaic is used as the tail-race
of the Dundee Power Company. The capacity of Wesel Brook channel is
limited, and the extraordinary amount of water which was turned into it
carried away all culverts and bridges from Richfield to Passaic.
Below Passaic, along the river front of Essex County, the damages to
bridges amounted to $50,000. (See Pl. VII, _B._) The loss due to
washouts in roads throughout the county amounted to $15,000. The
effects of the flood were apparent along the entire length of the river
and into Newark Bay. The damage from inundation in Newark and vicinity
amounted to $753,199.
The figures above given with reference to damage along Passaic River are
uncommonly accurate, being for the most part the result of a
house-to-house canvass by the northern New Jersey flood commission. As
has been stated above, tradesmen are reluctant to give full details with
reference to their losses through fear of injured credit. Roughly
estimating the damage as a whole, and taking into consideration factors
which were given to the writer confidentially, the damage throughout the
drainage area from this flood will amount to not less than $7,000,000.
PREVENTIVE MEASURES.
GENERAL DISCUSSION.
In the consideration of means of preventing damages by floods every plan
proposed falls under one of two general heads--the storage of flood
waters or an increase in the capacity of the streams.
The first plan involves the construction at selected localities of
reservoirs of sufficient size to hold all or a greater part of the
waters which run over the surface during and after storms. This plan is
not practicable except where valleys or plains are inclosed by high
ridges and these ridges approach sufficiently near each other to admit
of the economical construction of a bank or dam across the gorge or bed
of the stream which flows through, so that the inclosure will be
complete and form a water-tight basin. Where such a reservoir exists the
water can be held back and gradually let down through properly provided
gates so that the channel will not be flooded.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account