special boring-machines and to bore all the tubing required. Suffice it
to say, that the machines were built, and about six thousand feet of
tubes were bored, between November 8 and December 31.
[Illustration: FIG. 6.
_PIPE BORING APPARATUS._]
=Method of Manufacturing Tubes.=—The process of boring was novel in
some respects, and might be termed reaming rather than boring. Figs.
4 and 5 show the interior of the shop and the twelve machines. Fig. 6
is a drawing of one of the machines. A long flexible bar rotated the
cutter-head, which was pulled through the tube, in distinction from
being pushed. In order to give the feeding motion, a screw was attached
to the cutter-head and extended through the tube in advance of it. The
feed-screw was drawn forward by a nut attached to a hand-wheel located
at the opposite end of the tube from which the boring began. Since it
was not necessary that the tubes should be perfectly straight, a method
of this kind was permissible, in which the cutters could be allowed to
follow the cored axis of the tube. Air from a Sturtevant blower was
forced through the tubes during the process of boring, for the double
purpose of clearing the chips from the cutters and keeping them cool.
After the tubes were reamed, each piece had to be placed in a lathe,
have a counter-bore turned in the bottom of the bell, and have the
other end squared off and turned for a short distance on the outside to
fit the counter-bore of the next section.
=Laying and Opening the Tubes for Traffic.=—The first tubes were laid
about the middle of November, but December 1 came before the work was
completed and special permission had to be obtained from the city
to carry on the work after that date. All work was suspended during
the holidays in order not to interfere with the holiday trade of the
stores on Chestnut Street. Severe frosts prevailed at that season, so
that when the work was begun again, after the holidays, bonfires had
to be built in the streets to thaw out the ground in order to take up
the paving-stones and dig the trench for the tubes. Several times the
trench was filled with snow by unusually heavy storms. Notwithstanding
all these delays and annoyances, the work was pushed forward, when
a less determined company would have given it up, and was finally
completed. A formal opening took place on February 17, 1893, when Hon.
John Wanamaker, then Postmaster-General, sent through the tube the
first carrier, containing a Bible wrapped in the American flag.
It was certainly a credit to the Pneumatic Transit Company and its
managers that they were able to complete this first line of tubes so
quickly and successfully under such trying circumstances. The tubes
have been in successful operation from the opening until the present
time, a period of nearly four years, and the repairs that have been
made during that time have not required its stoppage for more than a
few hours.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account