twenty-five pounds and an air-pressure of from five to twenty-five
pounds per square inch. For further information the reader is referred
to the patents of Clay and Lieb.
=Franchises and First Government Contract.=—In the spring of 1892
an ordinance was passed by Common and Select Councils, and signed
by the Mayor of the City of Philadelphia, permitting the Pneumatic
Transit Company to lay pneumatic tubes in the streets of that city.
At the time this franchise was granted negotiations were in progress
with the post-office department, in Washington, for the construction
of a six-inch pneumatic tube, connecting the East Chestnut Street
sub-post-office, at Third and Chestnut Streets, with the main
post-office, at Ninth and Chestnut Streets, for the transmission of
mail. This sub-post-office was selected because more mail passes
through it daily than any other sub-office in the city, it being
located near the centre of the banking district. Negotiations were
delayed by various causes, so that the contract with the government was
not signed until October, 1892.
[Illustration: FIG. 4.
[Illustration: FIG. 5.
SIX-INCH PNEUMATIC TUBES IN PROCESS OF BORING AT THE SHOP OF A.
FALKENAU, PHILADELPHIA, PA.]
=Search for Tubes.=—It was at this time that the writer was first
employed by the Pneumatic Transit Company, as engineer, to superintend
the construction of this line. The company commenced at once to
carry out its contract with the United States government, both the
post-office department and the company being very desirous of having
the work completed before winter. The time was very short for such
an undertaking, but wrought-iron tubes had already been ordered of a
well-known firm who manufacture pipe and tubing of all kinds. After
waiting four or five weeks the first lot of tubes were finished,
but upon inspection it was found that they were not sufficiently
accurate and smooth on the interior to permit of their being used
for the purpose intended. The next thing that suggested itself was
seamless drawn brass tubes. While they would be very expensive, the
process of manufacture makes them eminently suited for the purpose,
but they could not be obtained in time. A city ordinance prohibits
the opening of the streets of Philadelphia during the winter months
except in extreme cases. Accurate tubes must be had, and had quickly.
It then occurred to the writer that it might be possible to bore a
sufficient quantity of ordinary cast-iron water-pipe and fit
the ends accurately together to answer our purpose. Inquiry was made
at nearly all the machine-shops in the city, to ascertain how many
boring-machines could be put upon this work of boring nearly six
thousand feet of six-inch pipe. It was found impossible to get the work
done in time, if it was to be done in the usual manner of boring with
a rigid bar. At last a man was found in Mr. A. Falkenau, engineer and
machinist, who was prepared to contract for the construction of twelve
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account