The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
The railway company provided the builders with a special railway down
the side of the cliff, as the approach was not completed. This was
a huge switch-back, where the trains ran from side to side, first
forwards and then backwards. The descent of the precipice in this
manner treated the bridge-builders to an exciting ride, which somewhat
unnerved them at first, as it was far and away too thrilling to be
pleasant. A cableway was also stretched across the gulch, and this
was used for transporting material from point to point. In fact, two
locomotives were dismantled and sent across this rope in pieces to
be re-erected on the opposite side.
[Illustration:
_Photo by permission of Pennsylvania Steel Co._]
VIEW OF THE GOKTEIK VIADUCT
There are eighteen steel towers--the highest brings the rails 325 feet
above the floor of the gorge--supporting 2,260 feet of bridging.]
When the bridge-builders arrived they found that Mr. G. Deuchars,
the engineer-in-chief to the railway, had completed the whole of the
preparations. The concrete pedestals for the steel towers stretched
across the floor of the ridge in two unbroken lines over the top
of the natural bridge through which the Chungzoune River makes its
subterranean way. All that the bridge-builders had to do was to set the
steel.
The viaduct was built upon the overhanging principle, in accordance
with the American practice, by means of a traveller. This was a
cumbersome piece of apparatus weighing 100 tons, with a long arm which
reached out over the gorge from tower to tower. To the native this
appliance was a source of infinite wonder. When it was pushed out to
its fullest extent, and the long arm appeared certain to lose its
balance and to topple into the ravine, they looked on with awe; and
when the Americans flew in the face of Providence, as they thought,
by venturing to the outermost point to carry out their work, they
shuddered. In fact, they never became accustomed to that traveller. Why
it did not capsize exceeded their comprehension.
The American workmen were assisted in their operations by 350 natives
brought from other parts of the country, and who were accustomed
somewhat to bridge-building. Once work was brought into swing, it went
forward with a rush, the steel towers springing up from their pedestals
to a height of 200 feet or so within two or three days. The men toiled
9¾ hours every day, and there was not a halt except when the monsoon
blew and it was well-nigh impossible to secure a foothold in exposed
positions, or when the torrential rainfall prevailed.
The white men found the heat particularly trying and exhausting. Those
perched 200 or 300 feet in the air, and fully exposed to the sun and
a temperature of 120 degrees, secured a little welcome shade under an
awning that was stretched over the apparatus. They wore the lightest
of clothing, while white pith helmets served to offer some protection
from sunstroke.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account