One inspiriting phase of the railway-builder’s work is the race
against time, and in the fulfilment of such a task many an astonishing
performance has been achieved. When one of the great American railways
was pushing its way to the Pacific coast, it required a tunnel to be
driven for two miles through the Cascades. It was a daring piece of
work, and the railway company, after considering the scheme, decided
that it could be accomplished cheaper and more quickly under contract
than by direct labour. Upon the advice of their surveyors they set the
time for its completion at twenty-eight months. Considering the remote
situation of the work the feat was considered absolutely impracticable,
and no recognised contractor could be prevailed upon to incur the risk.
The company, however, was convinced that some daring spirit existed who
could, and would, fulfil their requirements, so they advertised for
tenders. When these were perused it was found that one man was willing
to meet the time-limit and at a price far below competitors. His bid
was accepted. That man was Bennett, and he lost no time in setting his
carefully-laid plans in motion.
He was over three thousand miles from the country in which the tunnel
was to be driven, yet before the ink on the contract was dry he had
wired to his assistant on the Pacific coast to hurry forward all
requisite appliances, while he himself purchased an elaborate plant of
the most modern type to be shipped to the railway point nearest the
site. From this station he had to transport every ounce of material for
a distance of eighty-two miles through the roughest and most broken
mountainous country it is possible to conceive.
There was no road, so he had to blaze one through the deadfall and
littered rock, fording creeks and streams and toiling through viscous
mud. The wagons sank above the axles, and had to be hauled through the
muskeg by block and tackle. In this way, by sheer physical effort,
he gained the mountain which was to be pierced. It took him a solid
six months to get his forces and artillery to the spot, leaving him
scarcely twenty-two months in which to hew the passage through the
solid rock.
So pressing was time that he never permitted an hour’s cessation day or
night. An agent on the coast recruited men by the score and dispatched
them up country in large corps. As they arrived they were divided into
six-hour shifts on either side of the mountain, and in this way toil
was continued unbrokenly throughout the whole twenty-four hours. When
he had settled down to work in grim earnest wages were absorbing money
at the rate of nearly £2,000, or $10,000, per week.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account