The Railway Library, 1909: A Collection of Noteworthy Chapters, Addresses, and Papers Relating to Railways, Mostly Published During the Year
History
The Railway Library, 1909: A Collection of Noteworthy Chapters, Addresses, and Papers Relating to Railways, Mostly Published During the Year
Railroads -- United States -- Periodicals
Our measurements of distances commence at the depot of the Harrisburg
and Lancaster Railroad Company, 106¾ miles from the corner of Vine
and Broad streets, in the city of Philadelphia, and terminate at the
intersection of Liberty street, in the city of Pittsburg. Those made
for the Commonwealth, under the direction of Mr. Schlatter, began
at State street, in Harrisburg, and ended at Two Mile Run, on the
Monongahela river, giving a difference in favor of Mr. Schlatter's
line of about 1-8/10 miles in the points of starting. Between
Blairsville and Pittsburg our distance has been actually increased
2-8/10 miles over that proposed by Mr. S., after making allowance
for about 6/10 of a mile of an unaccountable discrepancy in the two
measurements. This increased distance is incurred to save three
tunnels, and other expensive work, amounting, together, to $280,000,
or $100,000 per mile.
The whole difference between Mr. Schlatter's and Mr. Miller's
measurements, supposing the points of starting and ending to have
been the same, is 4-3/10 miles. The difference between the points of
starting of the two surveys, on Mr. Foster's division, is about 2/10
of a mile. From Harrisburg to Huntingdon we lose, by following the
river route. 7/10 of a mile[A] on Mr. Schlatter's line, and save,
from thence to the summit of the mountain, about four miles.
As a connection with the Allegheny Portage Railroad would insure to
us most of the advantages of an independent road to the western base
of the mountain, it is evidently the policy of the Company to make
it at the earliest practicable moment. Our location falling within
6-1/3 miles of that road, it becomes a very small matter to effect a
junction with it. If the present means of the Company, however, would
justify the expenditure, the connection could readily be made at the
foot of Plane No. 4, on the west side of the mountain, thus saving
7 out of 10 of the inclined planes. This could be effected for the
additional sum of $1,250,000, or for $950,000 a junction might be
made at the summit of the Portage, avoiding the five eastern planes.
The branch to, or above, Hollidaysburg is, however, the cheapest and
most speedy way of effecting the connection, and when our road is
carried over the mountain it will remain a good feeder to the main
line, and a fair investment of the capital of the Company.
The following is an estimate of the cost of a continuous road from
Harrisburg to Pittsburg, in connection with the Allegheny Portage
Railroad, graded for a double track throughout, except the branch to
Hollidaysburg:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account