The paying-out apparatus for the two laying vessels H.M.S. Agamemnon and
U.S.N.S. Niagara had to be somewhat hurriedly put together; consequently
not as much attention was paid to its design as the novelty of the
undertaking really demanded. The previous, and somewhat primitive, gear
hitherto used had proved to possess too little strength, the cable--when
being laid in anything but quite shallow water--having more than once
obtained the mastery, through meeting insufficient restraining force. In
the new machine (Fig. 12) there was certainly no lack of holding-back
power. It erred, indeed, the other way, being so heavy and powerful that
it was liable to break the cable under any material strain. The degree
of retardation was regulated by a hand-wheel actuating a frame-clutch
surrounding the outside of a brake-wheel. The details of this machine
were worked out by Messrs. C. de Bergue & Co., the manufacturers. The
engineer-in-chief also furnished external guards to the propelling
screws of each laying vessel to prevent a foul with the cable in the
case of going "astern." This cage was nicknamed a "crinoline" (then in
fashion with ladies), which, indeed, it somewhat resembled. The above
screw-guard may be seen in several of the illustrations of either ships
farther on. Were it not for the necessity of sounding operations, it
would be applied to all telegraph-ships to-day.
_Preparations for Starting._--By the third week in July (within the
course of as many weeks) the great ships had absorbed all their precious
cargo--the Agamemnon in the Thames and the Niagara in the Mersey. The
process of coiling the cable on board the Agamemnon is illustrated in
Fig. 13.
[Illustration: FIG. 12.--The Paying-out Machine, 1857.]
_Staff._--For such an undertaking the staff had, of course, to be
considerable. Besides the engineer-in-chief (Mr. Bright), the
engineering department was composed as follows: Mr. (afterward Sir
Samuel) Canning, formerly a railway engineer, who had laid the Gulf of
St. Lawrence and other cables; Mr. William Henry Woodhouse, who had laid
some of the cables in the Mediterranean; Mr. F. C. Webb, with much
experience in early cable work; and, finally, Mr. Henry Clifford, a
mechanical engineer, destined to be responsibly associated with a large
proportion of the cables since laid.
Besides Mr. Whitehouse (whose health, however, did not permit him to
accompany the expedition) there were on the electrical staff Mr. C. V.
de Sauty, Mr. J. C. Laws, Mr. F. Lambert, Mr. H. A. C. Saunders, Mr.
Benjamin Smith, Mr. Richard Collett, and Mr. Charles Gerhardi, all of
whom were afterward prominently connected with subsequent submarine
cable undertakings. Their respective energies were divided up between
the two laying ships.[19] The expedition was to be further strengthened
by a representative of The Times, as well as of the Daily News and New
York Herald.
[Illustration: FIG. 13.--Coiling the Cable on Board.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account