It is only to be regretted that the electrician responsible for the
subsequent working through operations did not sooner appreciate the
great beauties of the above apparatus, and the advantage of a small
generating force such as it alone required.
CHAPTER V
THE TRIAL TRIP
Rehearsal of Cable Operations--Successful Experiments and Performances.
[Illustration: FIG. 22.--Deck of H.M.S. Agamemnon with Paying-out
Apparatus.]
The engineer-in-chief (Mr. Bright) arranged that this time an
experimental expedition should be first made, during which a complete
rehearsal was to be gone through of the various operations to be
performed during cable maneuvers. These operations were to consist of
making splices, picking up and buoying (besides laying) in deep water,
and exercising all hands in their work generally. It was on this
occasion also agreed that paying out should start from mid-ocean
instead of from either shore. It was further arranged that the main
cable should be buoyed at each end, and the connection to it by the
heavy cable from shore effected at the earliest opportunity.
[Illustration: FIG. 23.--Stowage of the Cable Coils on the Niagara.]
[Illustration: FIG. 24.--The Loading of the Agamemnon.]
All the 3,000 miles of cable was coiled into the two large ships by the
end of May. Fig. 22 gives a general idea of the paying-out apparatus
mounted on the deck of the Agamemnon, and Fig. 23 a view in section of
the fore-tanks of the Niagara when loaded with her cargo of cable. The
engineer had this time fitted cast-iron cones in the middle of each
cable-coil to meet the requirements of safe paying out, besides
providing a large margin of space to the hatchway above. Fig. 24 shows
the loading of the Agamemnon. The rest of the telegraph squadron was on
this occasion made up by H.M. Gorgon, H.M. paddle-steamer Valorous, and
H.M. surveying-steamer Porcupine.
The fleet set forth on their second cruise on May 29, 1858--this time
without any show of public enthusiasm. Mr. Bright was again assisted by
the same engineering staff, but Professor Thomson had agreed to take a
more active part in the electrical work. The Bay of Biscay was to be the
scene of the experiments--the actual site being about 120 miles
northwest of Corunna, where the Gorgon obtained soundings of 2,530
fathoms or nearly three statute miles.
The Agamemnon and Niagara were then backed close together, stern on, and
a strong hawser was passed between them. Each ship had on board some
defective cable for the experiments about to be conducted. The
proceedings may perhaps best be described by extracts from the
engineer's diary:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account