The allusion to bridges was rather more germane; for, in building the
line towards Whitchurch, which was the first section taken in hand, the
engineers were faced with a bridging problem of a peculiar nature, and
only less in magnitude than that which had confronted the constructors of
the famous Liverpool and Manchester Railway thirty years earlier. Partly
in order to avoid interfering with Sir John Hanmer's property, and partly
because they deemed it the better way, the engineers decided to carry the
line over Whixall Moss, a wide area of bog land lying between Bettisfield
and Fenns Bank. This, it was supposed, might even be drained by making
the railway across its quivering surface, but hopes of this sort were not
to be realised, for it remains to-day a wild, but picturesque stretch of
heather and silver birches, where the peat-digger plies his trade with,
perhaps, as much profit as the farmer would in tilling it. But as to its
power to bear the weight of passing trains the engineers had little
doubt. The canal already crossed it, and though in making soundings the
surveyors once lost their 35 foot rod in the morass, this, was near the
canal bank, and it did not deter them in their efforts to discover a
means of securing the railway from similar disaster. The average depth
of the moss was found to be twelve feet, but there were areas where it
was only nine feet deep, and at most 17 feet, and when the bottom was
reached it was discovered to be sand.
So, proceeding merrily, Mr. George Owen first drained the site of the
line by means of deep side and lateral drains filled with brushwood and
grig. He then laid strong faggots three feet thick and from eight to
twelve feet long, and over these placed a framework of larch poles
extending the entire width of the rails. The poles were then interlaced
with branches of hazel and brushwood and upon this the sleepers and rails
were laid, the whole being ballasted with sand and other light material.
And, in the end it proved a triumph for courage and ingenuity. Though
there might be some slight oscillation, heavy trains have been running
over this interesting two or three mile stretch for many a long year
without the slightest mishap.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account