Not to be outdone by little Ellesmere, another "first sod" was turned at
Oswestry on September 4th, 1862, by Miss Kinchant of Park Hall, and Miss
Lloyd, daughter of the Mayor of the borough, on the Shelf Bank field,
hard by the existing terminus of the Oswestry and Newtown Railway, with
which the new line was to be connected. The streets were in gala dress,
and while the leading citizens fared sumptuously on the Wynnstay Arms
bowling green, and disported themselves at a "rural fete," tea was served
to "the poorer women of the town and neighbourhood." In addition to the
residents many came from Ellesmere in wagons drawn by a decorated
traction engine,--significant emblem of the new power which was shortly
to bring the two neighbouring and ever friendly places within a quarter
of an hour's distance of each other.
Work now went ahead on both sections of the line, under the personal
supervision of Messrs. Thomas and John Savin and Mr. John Ward, and by
the spring of 1863 the railway was ready for traffic over the eleven
miles between Ellesmere and Whitchurch. The honour of being the first
passengers to make the journey belongs, appropriately enough, to the late
Capt. Jebb and his company of Rifles, who, by courtesy of the
contractors, were driven to Whitchurch on April 20th, a few other friends
accompanying them. The official trial trip was made shortly after, in a
train drawn by "two heavy engines," the "Montgomery" and the "Hero," and
in crossing Whixall Moss, we are told, "the deflection was almost
inappreciable." Captain Tyler was now able to pass the line as entirely
satisfactory, and, early in the morning on the first Monday in May, a
little group of Ellesmerians assembled at their new station to witness
the first regular train leave for Whitchurch. No doubt their hearts
swelled with pride, but beyond the usual exhibition of such emotion as so
notable an event inspired, there was no public acclaim.
Another twelve months were to elapse before the remaining section, from
Ellesmere to Oswestry, was ready for traffic. In July 1864, however,
this link was forged, and the event synchronizing with the completion of
the work at the other end of the chain, from Borth to Aberystwyth, it
threw open the whole length of what was about to become, under the
Consolidation Act, the main line of the Cambrian Railways.
[Picture: Advertisement for the Ceremony of Cutting the First Sod]
CHAPTER VII. THE COAST SECTION.
"_When they saw the Crimean Campaign they seemed about to be engaged
in against the sea, he thought it had been very much to the advantage
of the Welsh Coast line, if, on the formation of the Board the
Directors had been put through a series of questions in early English
history, and if their engineer had been directed to report to them on
the maritime events of the reign of Canute_."--EDWARD, THIRD EARL OF
POWIS.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account