If the proponents and promoters of the tunnel have never quite
succeeded in putting their project across in all the years, they have
never quite given up trying, either; and now, in a new strategic
era of nuclear rockets, a new era of transport in which air ferries
to the Continent carry cars as well as passengers, and a new era of
trade, marked by the emergence and successful growth of the European
Economic Community, or Common Market, the pro-tunnel forces have been
at it again, in what one of the leading pro-tunnelers has called
"a last glorious effort to get this thing through." This time they
have encountered what they consider to be the most encouraging kind
of progress in the entire history of the scheme. In April, 1960, an
organization called the Channel Tunnel Study Group announced, in
London, a new series of proposals for a Channel tunnel, based on a
number of recent elaborate studies on the subject. The proposals
called for twin parallel all-electric railway tunnels, either bored
or immersed, with trains that would carry passengers and transport,
in piggyback fashion, cars, buses, and trucks. The double tunnel, if
of the immersed kind, would be 26 miles long between portals. A bored
tunnel, as planned, would be 32 miles long and would be by far the
longest traffic tunnel of either the underwater or under-mountain
variety in the world. The longest continuous subaqueous traffic tunnel
in existence is the rail tunnel under the Mersey, connecting Liverpool
and Birkenhead, a distance of 2.2 miles; the longest rail tunnel
through a mountain is the Simplon Tunnel, 12.3 miles in length. The
Channel tunnel would run between the areas of Sangatte and Calais on
the French side, and between Ashford and Folkestone on the English
side. Trains would travel through it at an average speed of 65 miles
an hour, reaching 87 miles an hour in some places, and at rush hours
they would be capable of running 4,200 passengers and 1,800 vehicles on
flatcars every hour in each direction. While a true vehicular tunnel
could also be constructed, the obviously tremendous problems of keeping
it safely ventilated at present make this particular project, according
to the engineers, prohibitively expensive to build and maintain. The
train journey from London to Paris via the proposed tunnel would take
four hours and twenty minutes; the passenger trains would pass through
the tunnel in about thirty minutes. Passengers would pay 32 shillings,
or $4.48–$2.92 cheaper than the cost of a first-class passenger ticket
on the Dover-Calais sea-ferry—to ride through the tunnel; the cost
of accompanied small cars would be $16.48, a claimed 30 per cent less
than a comparable sea-ferry charge. The tunnel would take four to five
years to build, and the Study Group estimated that, including the rail
terminals at both ends, it would cost approximately $364,000,000.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account