Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
In summary, the improvement work on the Pacific Highway in Douglas
County during 1917 and 1918, including the work now under way, consisted
of 39.9 miles of grading and 7.0 miles of macadamizing.
The expenditures on the individual sections by the County, State and
Federal Government when final payments are completed, will be
approximately as follows:
======================+===========+===========+==========+===========
Sections | By | By | By | Total
| State | County | Federal |
| | | Govt. |
----------------------+-----------+-----------+----------+-----------
Lane County Line- | | | |
Comstock Grading |$ 2,027.30|$ 17,119.44| ... | $19,146.74
Lane County Line- | | | |
Comstock Macadam | 15,185.09| ... | ... | 15,185.09
Comstock-Leona | | | |
Grading and | 5,650.28| 74,349.72| ... | 80,000.00
Macadam | | | |
Oakland-Yoncalla | 17,565.28| 83,530.84| ... | 101,096.12
Grading | | | |
Myrtle Creek-Dillard | 120,000.00| ... | ... | 120,000.00
Grading | | | |
Canyonville-Galesville| 94,000.00| 23,000.00| 94,000.00| 211,000.00
Grading | | | |
Umpqua River Bridges | 45,500.00| ... | ... | 45,500.00
+-----------+-----------+----------+-----------
Total |$299,927.95|$198,000.00|$94,000.00|$591,927.95
----------------------+-----------+-----------+----------+-----------
[Illustration: BRIDGE ON PASS CREEK--20 FT. SPAN. ON PACIFIC HIGHWAY
NEAR COMSTOCK IN DOUGLAS COUNTY]
Grading--Comstock to the Lane County Line
This section runs through the northern portion of the Pass Creek Canyon,
and has been the dread of tourists heretofore. It has always been a hard
road to travel under summer conditions and absolutely impassable in
winter, even for horse-drawn conveyances.
The contract for this improvement involved 2.4 miles of grading and was
awarded to S. S. Schell of Oakland, Oregon on September 5, 1917. The
bulk of the grading was done that fall and the job was completed in the
spring of 1918. The road bed was graded to a width of 24 feet with 5 per
cent maximum grades and easy curves. In addition to the grading, the
contract included two drainage structures over Pass Creek, one a double
6x6 reinforced concrete box culvert and the other a 20-foot reinforced
concrete bridge. All construction charges were paid by Douglas County.
Engineering charges were paid by the State.
Mr. E. B. Bishop was the Resident Engineer in charge on this section.
DETAILED EXPENDITURE STATEMENT--GRADING COMSTOCK TO LANE COUNTY LINE
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account