Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910: The New York Tunnel Extension of the Pennsylvania Railroad,; The North River Division. Paper No. 1151Jacobs, Charles M. (Charles Mattathias)
History
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910: The New York Tunnel Extension of the Pennsylvania Railroad,; The North River Division. Paper No. 1151
Jacobs, Charles M. (Charles Mattathias)
Civil engineering -- Periodicals; Railroad tunnels -- Design and construction
_River Tunnels._--In the original plan a four-track tunnel was
contemplated from the east side of Tenth Avenue to the east side of
Eleventh Avenue, but, owing to the extension of the Terminal Yard,
previously noted, this plan was changed, and a two-track structure was
built having a central wall between the tracks. This was constructed in
tunnel, with the exception of 172 ft. about midway between Tenth and
Eleventh Avenues, where the rock dipped below the roof of the tunnel,
and there the construction was made in open cut. These tunnels were
lined with concrete with brick arches, Figs. 6, 7, and 8 being typical
cross-sections. This work was executed by the O'Rourke Engineering
Construction Company, under a contract dated November 1st, 1904.
It was possible to excavate in full rock cover about 250 ft. of the
tunnels eastward from the Weehawken Shaft and 225 ft. westward from the
Manhattan Shaft. At these points the rock cover was very thin, and there
shield chambers were made for the erection of two sets of shields, about
6,100 ft. apart. A typical cross-section of the Weehawken Land Tunnel is
shown on Plate VIII.
[Illustration: Plate VIII.--Typical Sections Between Manholes, Bergen
Hill Tunnels]
The Board of Engineers decided, and it was so stated in the contract and
specifications, that the river tunnels should be constructed by means of
hydraulic shields, but bidders were permitted to present to the Board
any scheme on which they might desire to bid, but, of course, the
decision as to the practicability of such plans rested with the Board.
Inasmuch as the shield method of construction was required, the writer
designed a shield for use in the North River Tunnels. The shield was
about 18 ft. long, over all, and was provided with a rigid but removable
hood extending beyond the normal line of the cutting edge, for use in
sand, gravel, and ballast, to be removed when the shield reached the
silt. The shields were thrust forward by twenty-four rams capable of
exerting a pressure of 3,400 tons at a hydraulic pressure of 5,000 lb.
per sq. in. Taking into account 30 lb. air pressure, this pressure was
increased to 4,400 tons. The shield was fitted with a single hydraulic
erector and hydraulic sliding platforms, and when complete weighed 194
tons. Fig. 9 is a back elevation and section of the shield.
The contract for the river tunnels was let to the O'Rourke Engineering
Construction Company on May 2d, 1904.
The shields were built in accordance with the design previously referred
to, and proved entirely satisfactory. Generally, the materials passed
through were as follows: Starting out in full face rock, from it into a
mixed face of rock and sand, thence into sand and gravel, full face of
sand, piles, rip-rap, and the Hudson silt; and all were fully charged
with water.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account