_Mucking and Disposal._--The conditions affecting the disposal of the
muck, after blasting, were quite different at the two ends, the grade
descending in the direction of the loads at Weehawken and ascending at
the Hackensack end. At the Weehawken end the mouth of the tunnels was at
the bottom of a shaft some 80 ft. deep, Fig. 2, Plate XXII, the muck in
the tunnel cars being hoisted by elevators to a platform at the top from
which it was dumped into standard-gauge cars supplied by the Erie
Railroad, as shown by Fig. 7; or later hauled to the crusher or storage
pile, some 500 ft. distant, on the north side of Baldwin Avenue. At the
western end, the cars were hauled directly to the surface through the
approach cut, and the material, except that required for concrete and
rock packing, was deposited in the embankment across the Hackensack
Meadows, a haul of from 1,000 to 3,000 ft. beyond the portal.
All disposal tracks were of 3-ft. gauge, the main running tracks being
generally laid with 60-lb. second-hand rails, although some of lighter
weight were used.
Except for about 1,000 ft. in each tunnel at the Weehawken end, where
the muck was loaded by hand, four steam shovels, operated by compressed
air, were used, one at each working face. One of these was a “Marion,
Model No. 20,” weighing 38 tons, the others were “Vulcan Little Giant,”
of about 30 tons each. All these shovels were on standard-gauge track,
and were moved back from 300 to 500 ft. from the working face during
blasting.
[Illustration: Fig. 7.
METHOD OF EMPTYING DUMP CARS AT WEEHAWKEN SHAFT:
FRONT VIEW, SIDE VIEW]
At Weehawken, previous to the time the shovels were installed, the muck
was shoveled by hand into the cars from the bottom of the bench, and the
heading muck was dumped into them from the movable platform (Jumbo)
shown by Fig. 1, Plate XXII. There were three loading tracks at the
face. The cars used at that time were similar to that shown by Fig. 5,
but were about two-thirds the size and had no end door; stop-planks were
supposed to be placed in the ends but seldom were. The loads averaged
about ½ cu. yd. (measured in place). After the shovel was installed the
cars shown by Fig. 5 were used, and the loads averaged nearly 1 cu. yd.
The empty cars were pushed up to the shovel by hand from the storage
track. When loaded, they were given a start with the bucket of the
shovel, and were then allowed to coast by gravity out to the storage
track near the shaft, where they were stopped by placing rolls of cement
bags or burlap on the rails. After the lining was started, the loaded
cars were stopped on the inside of the lining and only sent out over the
single track through this latter at stated intervals, when several cars
followed in close succession, with a long interval which permitted the
concrete to be brought in. The empty cars were hauled back to the
storage track near the working face by mules, one mule usually hauling
two cars at a time.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account