A monthly report was made to the chief engineer, giving detailed
statistics of the amount of work done, etc., plant installed, and short
notes of any matter of interest affecting the work in any way.
TUNNEL LINING.
_Preliminary Considerations._--For the placing of the concrete lining, a
sub-contract was given to Messrs. King, Rice and Ganey, by Mr. Bradley,
which provided substantially that all materials should be supplied by
him, and delivered to the sub-contractors at track level, at or near the
point in the tunnel at which they were to be placed, and that he would
supply light and power; the sub-contractors were to supply the plant,
forms, and labor necessary for placing the concrete and water-proofing,
building the conduit lines, manholes, etc., etc., to complete the
lining, the general form of which is shown on Plate VIII of the paper by
Mr. Jacobs, and in Fig. 10. The latter also shows the different sections
into which the lining was divided for purposes of construction, and the
nomenclature adopted for each. It may be noted, incidentally, that the
cubic contents of the lining per linear foot of tunnel is almost exactly
half the quantity excavated, out to the standard section lines, and as
there was some excavation outside of these lines, all of which had to be
replaced, the actual quantity of material which had to be brought back
into the tunnel was quite a little more than half the quantity taken
out. It will be evident, therefore, that the question of transportation
was an important one.
[Illustration: Fig. 10.
SKETCH SHOWING DIVISION OF LINING FOR PURPOSES OF CONSTRUCTION,
AND NAMES OF SECTIONS]
An essential part of the agreement with the sub-contractors provided
that the operations incident to the placing of the lining should be
carried on so as to provide at all times space for a single track of
3-ft. gauge, running through the work, and the necessary clearance for
the locomotives and cars used in hauling out the muck. A clearance
diagram of one of the “dinkys” used in the tunnels, and its relation to
the forms used, is shown by Fig. 12 and also by Fig. 16, the 4-yd.
Allison cars, used for handling the muck, taking practically the same
width, although they were not quite as high. This requirement and the
limited space available must be kept in mind in considering the design
finally adopted for the forms and plant required in placing the lining.
It should also be kept in mind that, with the rolling stock used, there
was only room for a single track through that part of the tunnel where
any concrete had been built. As the concrete progressed, therefore, the
length of single track was necessarily lengthened, and the problem of
transportation was made increasingly difficult.
In working out a design for the bench-wall forms, another highly
important and controlling factor, which had to be considered, was the
arrangement of the conduit lines, as shown in the general
cross-section.[2]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account