Trench Warfare: A Manual for Officers and MenSmith, Joseph S. (Joseph Shuter)
History
Trench Warfare: A Manual for Officers and Men
Smith, Joseph S. (Joseph Shuter)
Intrenchments; Siege warfare
It is only under very exceptional circumstances that under-cutting a
trench wall is allowed, and then the shelter should be cut in the rear
wall only. These shelters must be carefully supervised and watched by
the officer, as men are very often careless, with the result that the
shelters are dug in a hurry and poorly. Then it rains, the shelter
falls in, and the men are no more. It should be high enough for a man
to sit up straight, and long enough for him to lie down in, and deep
enough for two men to lie side by side. It should be raised at least
a foot above the floor level in the trench to prevent water from the
trench floor coming in. A shelter smaller than these dimensions is
useless. It has a demoralizing effect, destroying all activity, mental
and physical. These shelters can only be properly made by cutting into
the rear trench wall the necessary depth and length and right to the
top. Then, with any material which is convenient, such as corrugated
iron, brushwood, old rubber sheets, revet the sides and back. A
corrugated iron roof is supported on posts at a depth of about a foot
to a foot and a half below the normal level of the ground. Then, when
possible, cover this with rubber sheets. If not possible to procure
rubber sheets, simply cover with dirt excavated from shelter, taking
care that it does not rise higher than your parados.
[Illustration: FIRE TRENCH, SHOWING ENTRANCE TO SHELTER
The shelter is of use only in a narrow or deep trench. Note that the
floor is above the bottom of the trench.]
A fire-trench, however, is not a proper place for shelters, and they
are generally better as a weather protection than a shell-proof
shelter. Even this should not be favored too much, as it tends to cause
obstruction, delay and inconvenience in the passing of troops. The
real dugouts for the accommodation of men holding a line are generally
behind the fire-trenches in an immediate support line, or as in the
case of T-bays, in the control trench and communication trenches
leading to and from them. These are large dugouts, having a depth of
30 and 40 feet, and in some cases capable of holding 100 to 250 men,
generally having from 5 to 10 exits and entrances. Here the men stay
during bombardments and are generally safe from any caliber shell
which may light on top, unless a half dozen should light in the same
particular spot.
This work is generally of a very skilled and technical kind. Plans,
drawings and labor are supervised by the engineers, expert tunnelers
being used in constructing work, although the infantry supplies working
parties to dispose of the dirt, etc., resulting from these excavations
and to carry the materials and tools needed and required in the
construction.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account