In either case the leading center over which the arch
masonry terminates temporarily is left in position until the next
section of the arch is built.
=Masonry.=--The masonry of the roof arch, which is the first part built,
is of necessity begun at the springing lines, and the first course rests
on short lengths of heavy planks. These planks, besides giving an even
surface upon which to begin the masonry, are essential in furnishing a
bearing to the struts inserted to support the arch while the earth below
them, part No. 5, Fig. 68, is being excavated. As the arch masonry
progresses from the springing lines upward, the radial posts of the
strutting are removed, and replaced by short struts resting on the
lagging of the centers, which support the crown bars or longitudinals
until the masonry is in place, when they and the poling-boards are
removed, and the space between the arch masonry and walls of the
excavation is filled with stone or well-rammed earth.
Considering now the side wall masonry, it will be remembered that in
excavating the part No. 5, Fig. 68, of the section, frequent side
trenches were excavated, and struts inserted to take the weight of the
masonry. These struts are inserted on a batter, with their feet near the
center of the tunnel floor, so that the side wall masonry may be carried
up behind them to a height as near as possible to the springing lines of
the arch. When this is done the struts are removed, and the space
remaining between the top of the partly finished side wall and the arch
is filled in. This leaves the arch supported by alternate lengths or
pillars of unexcavated earth and completed side wall. The next step is
to remove the remaining sections of earth between the sections of side
wall, and fill in the space with masonry. Fig. 71 is a cross-section,
showing the masonry completed for one-half and the inclined props in
position for the other half; and Fig. 72 is a longitudinal section
showing the pillars of unexcavated earth between the consecutive sets of
inclined struts and several other details of the lining, strutting, and
excavating work.
[Illustration: FIG. 71.--Sketch Showing Method of Underpinning Roof Arch
with the Side Wall Masonry.]
[Illustration: FIG. 72.--Longitudinal Section Showing Construction by
the Belgian Method.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account