=Strutting.=--The side drifts were strutted by means of frames composed
of two batter posts resting on boards, and having a cap-piece extending
transversely across the roof of the drift. These frames were spaced
about 4 ft. apart. The excavation was advanced in the usual way by
driving poling-boards at the top and sides, with a slight outward and
upward inclination, so that the next frame could be easily inserted
leaving space enough between it and the sheeting to permit the next set
of poling-boards to be inserted. These poling-boards were driven as
close together as practicable so as to prevent as much as possible the
inflow of water and earth.
[Illustration: FIG. 81.--Sketch Showing Method of Excavating and
Strutting Baltimore Belt Line Tunnel.]
The center top heading was strutted in the same manner as were the side
drifts. The arrangement of the strutting employed in enlarging the
center top heading is shown clearly by Fig. 81, which also shows the
manner of strutting the side drifts and face of the excavation, and of
building the masonry.
=Centers.=--Both wood and iron centers were employed in building the
roof arch. The timber centering was constructed of square timbers, as
shown by Fig. 82. This construction of the iron centers is shown by Fig.
83. Each of the iron centers consisted of two 6 × 6 in. angles butted
together, and bent into the form of an arch rib. Six of these ribs were
set up 4 ft. apart. They were made of two half ribs butted together at
the crown, and were held erect and the proper distance apart by spacing
rods. The rearmost rib was held fast to the completed arch masonry, and
in turn supported the forward ribs while the lagging was being placed.
[Illustration: FIG. 82.--Roof Arch Construction with Timber Centers,
Baltimore Belt Line Tunnel.]
=Masonry.=--The side walls of the lining were built first in the bottom
side drifts, as shown by Fig. 81. They were generally placed on a
foundation of concrete, from 1 ft. to 2 ft. thick. As a rule the side
walls were not built more than 20 ft. in advance of the arch, but
occasionally this distance was increased to as much as 90 ft. The roof
arch consisted ordinarily of five rings of brick, but at some places in
especially unstable soil eight rings of brick were employed. The arch
was built in concentric sections about 18 ft. in length. All the timber
of the strutting above the arch and outside of the side walls was left
in place, and the voids were filled with rubble masonry laid in cement
mortar. It required about 125 mason hours to build an 18-ft. arch
section. Figs. 82 and 83 show various details of the masonry arch work.
[Illustration: FIG. 83.--Roof Arch Construction with Iron Centers,
Baltimore Belt Line Tunnel.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account