Owing to the very unstable character of the soil, considerable
difficulty was experienced in building the masonry invert. The process
adopted was as follows: Two parallel 12 × 12 in. timbers were first
placed transversely across the tunnel, abutting against longitudinal
timbers or wedges resting against the side walls. Short sheet piles were
then driven into the tunnel bottom outside of these timbers, forming an
inclosure similar to a cofferdam, from which the earth could be
excavated without disturbing the surrounding ground. The earth being
excavated, a layer of concrete 8 ins. thick was placed, and the brick
masonry invert constructed on it. In less stable ground each of the
above described cofferdams was subdivided by transverse timbers and
sheet piling into three smaller cofferdams. Here the masonry of the
middle section was first constructed, and then the side sections built.
Where the ground was worst, still more care was necessary, and the
bottom had to be covered with a sheeting of 1¹⁄₄-in. plank held down by
struts abutting against the large transverse timbers. The invert masonry
was constructed on this sheeting. Refuge niches 9 ft. high, 3 ft. wide,
and 15 ins. deep were built in the side walls.
=Accidents.=--In this tunnel, owing to the quick striking of the
centers, it was found that the masonry lining flattened at the crown and
bulged at the sides. This was attributed to the insufficient time
allowed for the mortar to set in the rubble filling. Earth packing was
tried, but gave still worse results. Finally dry rubble filling was
adopted, with satisfactory results. There was necessarily some sinking
of the surface. This resulted partly from the necessity of changing and
removing of the timbers, and from the compression and springing of the
timbers under the great pressures. The crown of the arch also settled
from 2 ins. to 6 ins., due to the compression of the mortar in the
joints. The maximum sinking of the surface of the street over the tunnel
was about 18 ins.; it usually ran from 1 to 12 ins. Some damage was done
to the water and gas mains. This damage was not usually serious, but it
of course necessitated immediate repairs, and in some instances it was
found best to reconstruct the mains for some distance. At one point
along the tunnel where very treacherous material was found, the surface
settlement caused the collapse of an adjacent building, and necessitated
its reconstruction.
CHAPTER XIV.
THE FULL SECTION METHOD OF TUNNELING: ENGLISH METHOD; AMERICAN METHOD;
AUSTRIAN METHOD.
ENGLISH METHOD.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account