[Illustration: ~Section G-H.~
~Longitudinal Section.~
FIG. 92.--Transversal and Longitudinal Section of a Tunnel Excavated and
Strutted According to the American Method.]
=Strutting.=--The longitudinal strutting is used in connection with the
American method of tunneling. In fact, the strutting consists of a
series of longitudinal bars supporting planks laid transversally to the
axis of the tunnel and abutting against the roof of the excavation.
These crown bars during the excavations and immediately after are
temporarily supported by radial timbers forming almost a fan-like
structure, but this is soon substituted by a permanent one composed of a
polygonal timber frame of five or seven segments which are cut to
dimensions. The batter posts of the heading, the radial posts of the
temporary timber structure and the crown bars are all round timbers from
10 to 12 ins. in diameter. All the other timbers are square edged, the
usual dimensions being 10 × 10 ins. or 12 × 12 ins. with the exception
of the wall plates which are 14 × 14 ins. The dimensions of the various
members of the strutting and the distance apart of the different frames
vary with the quality of the soil. For instance, in ordinary loose
soils the frames are placed between 4 to 6 ft., but in very soft soils
they are erected only 3 or 3¹⁄₂ ft. apart.
Chiefly in the southwest, in tunnels excavated according to the American
method, the timbering has been left as regular lining and it was only
after many years when this temporary structure had decayed or was burned
down, that the tunnels were lined with masonry. But in many instances
the whole timber structure was left in place even when the tunnel was
lined with masonry immediately after the excavation had been made. This
was usually done when the tunnel was lined with concrete masonry. In
such a case the timbering was left to support the pressures of the roof
while the concrete was plastic and before it hardened.
=Centers.=--In the American method the whole section of the tunnel is
open before the construction of the lining, thus the masonry can be
built from the foundations up. The centers are designed so as to support
only the weight of the masonry during its construction and not the
pressures of the tunnel as in the other methods and consequently they
are of light construction. The centers described in the Murray Hill
tunnel, page 123, may be advantageously used in building the concrete
lining in tunnels through loose soils excavated by the American method.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account