It may be noted in closing that the same rule may be employed in
determining the location of the ends of the tunnel, for assuming that it
is more convenient to excavate a tunnel than an open cut when the depth
exceeds 60 ft., then the open cut approaches should extend into the
mountain- or hill-sides only to the points where the surface is 60 ft.
above grade, and there the tunnel should begin. If, therefore, we draw
on the longitudinal profile of the tunnel a line parallel to the plane
of the tracks, and 60 ft. above it, this line will cut the surface at
the points where the open-cut approaches should cease and the tunnel
begin. This is a rule-of-thumb determination at the best, and requires
judgment in its use. Should the ground surface, for example, rise only a
few feet above the 60 ft. line for any distance, it is obviously better
to continue the open cut than to tunnel.
THE METHOD AND PURPOSE OF GEOLOGICAL SURVEYS.
When it has been decided to build a tunnel, the first duty of the
engineer is to make an accurate geological survey of the locality. From
this survey the material penetrated, the form of section and kind of
strutting to be used, the best form of lining to be adopted, the cost of
excavation, and various other facts, are to be deduced. In small tunnels
the geological knowledge of the engineer should enable him to construct
a geological map of the locality, or this knowledge may be had in many
cases by consulting the geological maps issued by the State or general
government surveys. When, however, the tunnel is to be of great length,
it may be necessary to call in the assistance of a professional
geologist in order to reconstruct accurately the interior of the
mountain and thereby to ascertain beforehand the different strata and
materials to be excavated, thus obtaining the data for calculating both
the time and cost of excavating the tunnel.
The geological survey should enable the engineer to determine, (1) the
character of the material and its force of cohesion, (2) the inclination
of the different strata, and (3) the presence of water.
=Character of Material.=--The character of the material through which
the proposed tunnel will penetrate is best ascertained by means of
diamond rock-drills. These machines bore an annular hole, and take away
a core for the whole depth of the boring, thus giving a perfect
geological section showing the character, succession, and exact
thickness of the strata. By making such borings at different points
along the center line of the projected tunnel, and comparing the
relative sequence and thickness of the different strata shown by the
cores, the geological formation of the mountain may be determined quite
exactly. Where it is difficult or impracticable to make diamond drill
borings on account of the depth of the mountain above the tunnel, or
because of its inaccessibility, the engineer must resort to other
methods of observation.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account