A brick bulkhead was built into the end of the brickwork of the tunnel,
and provided with a timber door for passage, and two 10-in. pipes for
the outlet of the water. With these openings closed, the flow was
checked sufficiently to allow the placing of pumps at the bottom of the
shore shaft. Meanwhile the pressure of the water against the bulkhead
caused dangerous leakage, and so after the pumps were in position the
10-in. pipes were opened, relieving the pressure and allowing the water
its normal rate of flow. Trouble with the pumps now arose, and after
various stoppages and breaks the discharge pipe finally fell, disabling
the whole plant. It became necessary to close the 10-in. pipes in the
bulkhead and draw up the pumps. This allowed the tunnel to again fill
with water.
After thoroughly overhauling the pumping machinery, the contractor again
laid the tunnel dry on March 19; and after the pumps had been
permanently placed so as to take care of the water, an examination of
the work was made. It was found that the water was coming from the
north, and with the hope of avoiding the difficulties of the old
heading, it was decided to make a détour of the south. On April 16 work
was begun at a point about 90 ft. back from the face, and deflecting the
line about 38° toward the south. About 38 ft. from the angle of junction
a brick bulkhead with two 8-in. openings was built into the new bore.
The work progressed successfully for about 75 ft., when water was again
encountered; and upon pushing forward the heading, gravel and sand came
in such quantities that it was found impracticable to continue the work
further. On June 1 the bulkhead was permanently closed, and the work in
this direction was abandoned.
A further and closer examination was now made of the heading first
abandoned. Upon breaking through the rock-like clay it was found that
the water came from an underground stream flowing from the north through
a well defined channel in red clay. This channel was about 13 ft. above
the grade of the tunnel; and above it in every direction visible was a
bed of hard, dry, red clay, while immediately in front of the face of
the work was a bank of coarse gravel. Fig. 122 is a sketch of the
channel and stream where they entered the work. In this last drawing the
photograph has been followed exactly, no particular being exaggerated in
the slightest. The water from this stream was clear and pure; and a
chemical analysis showed that it was not lake water, but must come from
some separate source.
[Illustration: FIG. 122.--Sketch Showing Underground Stream, Milwaukee
Water-Works Tunnel.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account